Search Forum
Blog Entry# 3263891
Posted: Apr 02 2018 (20:20)
14 Responses
Last Response: Apr 02 2018 (22:18)
14 Responses
Last Response: Apr 02 2018 (22:18)
click here
Finally someone is sensible enough to understand that 100% electrification is not possible in a short span.
Finally someone is sensible enough to understand that 100% electrification is not possible in a short span.
9 Posts
Actually IR has the plans of installation of ETCS2 across the whole country instead of the conventional Green-Amber-Red lighting. This will totally revolutionarize the railway system.
Electrification se passengers ka visible benefit negligible hai, 100% electrification k betuke kaam ki jagah railway ko doubling or Signaling system k improvement per time or paisa lagana chahiye taaki kum se kum train ki speed or punctuality improve ho. Aise routes ka electrification ho raha hai jahan 24 ghante me 4 train bhi nahi chalti.
On an avg
10 crore per KM for doubling/NL
1 crore per KM for electrification.
10 crore per KM for doubling/NL
1 crore per KM for electrification.
This GTL-GNT was very costly in terms of electrification /blog/post/3231148
less than a crore per Km, as per this article: click here