Search Forum
Blog Entry# 3499664
Posted: Jun 07 2018 (10:29)
6 Responses
Last Response: Jul 20 2018 (09:40)
6 Responses
Last Response: Jul 20 2018 (09:40)
Jun 07 2018 (10:29) 18520/Mumbai LTT - Visakhapatnam Express (Via Vijayawada) (PT)
venkat_vskp~
venkat_vskp~ 6448 blog posts1 Posts
SLO -DVD did in 1 hr 41 min
19. SAMALKOT JN(SLO) 2 08:39 08:40 08:55 16 min 08:57 17 min
1358
DUVVADA(DVD) 10:38 U.A.
1491
19. SAMALKOT JN(SLO) 2 08:39 08:40 08:55 16 min 08:57 17 min
1358
DUVVADA(DVD) 10:38 U.A.
1491
this is a regular affair. recently when I travelled, 18520 departed RJY at 8.10. SLO at 8.55. Crossed DVD at 10.25. Did SLO-VSKP in flat 1.50 hrs.
However we reached VSKP PF5 at 11.45 as we were trolled badly before GPT crossing due to freights coming from SCMN.
However we reached VSKP PF5 at 11.45 as we were trolled badly before GPT crossing due to freights coming from SCMN.
Freight ? These lines are dedicated to Passenger coach. NO freight goes to VSKP station.
I was referring to the bypass line connecting DVD -VSKP line to VSKP-VZM line for movement of freight. Our train was stopped because of a full-length freight crossing tracks from SCMN towards DVD.
Ya that line has PSR of 30 kmph. It takes time and BOTH sides passenger coach trains will be stopped if that line used.