Search Forum
Blog Entry# 3542535
Posted: Jun 17 2018 (16:50)
12 Responses
Last Response: Mar 10 2019 (04:33)
12 Responses
Last Response: Mar 10 2019 (04:33)
SER intiative to increase maximum permissible speed in different sections click here
8 Posts
May Be 110 But I Am Not Sure, Previously It Was Having MPS Of 90
even if MPS is 90, then also for covering 37 km. Why trains are taking 55 minutes?
Dhanbad- Chandrapura is 37km too, when DC line was operational, Shatabdi used to cover in 50 minutes.
Dhanbad- Chandrapura is 37km too, when DC line was operational, Shatabdi used to cover in 50 minutes.
This route is very congested trains are taken min. 1 hour to complete, few sf trains like puru,lalmati,jalian..., south bihar etc. Those are taken time to complete this 50-60 minutes .
But max permissible speed is 100-110km/hr.
But max permissible speed is 100-110km/hr.
No, MPS might be about 90+ and because of major cni-matha, chi-lalgarh elephant corridor and curves PSR , TSR is present on that section.
Adra - Bhojudih, SF trains are taking around 40 minutes.
how come MPS is 110 kmph.
how come MPS is 110 kmph.