Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Sri Jagannath Express is as good as Abada Prasad - Brandon Buffard

Search Forum
<<prev entry    next entry>>
Blog Entry# 3558220
Posted: Jun 21 2018 (19:17)

11 Responses
Last Response: Aug 10 2018 (04:39)
Rail Fanning
11774 views
25

★★★
Jun 21 2018 (19:17)   12159/Amravati - Jabalpur SF Express | AMI/Amravati (Terminal) (4 PFs) | GZB/WAP-1/22050
Chetanneware95gmail.~
Chetanneware95gmail.~   1537 blog posts
Entry# 3558220            Tags   Past Edits
New Visitor of Amravati Terminus GZB WAP-1 22050 #offlink Hauled with 12159 Amravati🔁Jabalpur Superfast Express
Date- 21/06/2018
Translate to English
Translate to Hindi

6 Posts

4302 views
2

Jun 22 2018 (09:33)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 3558220-7              
For starters, it is cheaper and simpler than a regular Catenary+Contact wire configuration seen on IR's main lines. It is also cheaper to maintain and construct.
The speed is restricted. Normally such lines are good up to 80kmph. But with the mixed track conditions here (freight + passenger), the speed limit could be lower as well. The restriction will be only on electric locos as the diesel locos do not depend on the OHE.
Since the wire contracts and expands with temperature, and
...
more...
can also oscillate due to the upward pressure of the pantograph, a good contact cannot be maintained between the panto and the wire at higher speeds. This reduces the amount of currrent drawn and subsequently, is not suitable for high speed runs. In a catenary system, this problem is solved by having a second wire above the ocntact wire, which holds the contact wire in a relatively stable position.

Translate to English
Translate to Hindi

4366 views
3

Jun 22 2018 (09:34)
Reva18~
Reva18~   56837 blog posts
Re# 3558220-8              
No freight traffic on BD-AMI line......freights run on BD-NAVI-NRKR route
Translate to English
Translate to Hindi

4458 views
0

Jun 22 2018 (09:39)
Chetanneware95gmail.~
Chetanneware95gmail.~   1537 blog posts
Re# 3558220-9              
Idk
Translate to English
Translate to Hindi

4223 views
2

Jun 22 2018 (09:46)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 3558220-10              
I believe the short section between Badnera and the bifurcation point of the line to New Amravati was rewired when the Narkher route was getting electrified. Some old videos show the single wire OHE running all the way from Badnera to Amravati.
Even for pure passenger traffic, the speed may be restricted for longer rakes as they require more power from the OHE and consequently, the poor contact at higher speeds causes more problems.
Translate to English
Translate to Hindi

2712 views
1

Aug 10 2018 (04:39)
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Re# 3558220-11              
NRKR-BADNERA line joining AMI-BD line.
click here
Badnera bypass line.
click here
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy