Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

चलती है (ग्वालियर-भोपाल वाया गुना बीना ICE) उड़ती है धूल जलते है दुश्मन खिलते है फूल - Adi Singh

IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Search Forum
<<prev entry    next entry>>
Blog Entry# 3670754
Posted: Jul 30 2018 (10:17)

10 Responses
Last Response: Jan 12 2019 (18:27)
Info Update
42472 views
6

Jul 30 2018 (10:17)  
SteelCityRF^~
SteelCityRF^~   27542 blog posts
Entry# 3670754               Past Edits
1) Traffic survey
Traffic survey includes a detailed study of the traffic conditions in the area.
Traffic surveys are normally undertaken in conjunction with reconnaissance or preliminary engineering surveys so that the technical feasibility and relative costs of alternative proposals can be formulated. The traffic survey team should work in close cooperation with the engineering survey team. The survey team should visit all trade centres in the area and consult local bodies, state governments, and prominent citizens regarding trade and industry and propose the most suitable alignment for the new line.
The
...
more...
traffic survey team should make an assessment of the traffic likely to be carried by to the new line. While carrying out the survey, details of traffic likely to be offered by various government organizations, public bodies, or private enterprises should be gathered.
At the end of the survey, a report should be formulated by the officer-in-charge of the survey. The formation of the report is governed largely by the nature of the terms of reference and the investigations made. The traffic survey report should normally contain the following information:
(a) History of the proposal and terms of reference
(b) General description
(c) Potentials and prospects
(d) Industrial and economic development and traffic projections
(e) Population projection and volume of passenger traffic
(f) Existing rates and rates to be charged
(g) Location of route or routes examined, alternate routes, and possible extensions
(h) Station sites and their importance
(i) Train services, section capacity, and various alternative ways of increasing capacity
(j) Coaching earnings
(k) Goods earnings
(l) Working expenses and net receipts
(m) Engineering features
(n) Telecommunication facilities
(o) Financial appraisal
(p) Conclusions and recommendations
Source: click here

Translate to English
Translate to Hindi

13 Posts
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy