Search Forum
Blog Entry# 3738049
Posted: Aug 22 2018 (17:11)
11 Responses
Last Response: Aug 22 2018 (22:32)
11 Responses
Last Response: Aug 22 2018 (22:32)
New Facilities/Technology
NER/North Eastern
Ehtram Husain~ 10595 news posts
राजन रायगोरखपुर। अब ड्राइवर ट्रेन को फुल स्पीड से चला सकेंगे। उन्हें दो किलोमीटर पहले से ही सिग्नल सतर्क कर देगा। इससे जहां समय की बचत...
6 Posts
Good news from NER.
ABS would have been better so that gap between two trains would have been reduced somewhere 1 or 1.5Km but as they are installing IBS which means gap between two trains would be somewhere 2 or 3Km. Well something is better than nothing.
ABS would have been better so that gap between two trains would have been reduced somewhere 1 or 1.5Km but as they are installing IBS which means gap between two trains would be somewhere 2 or 3Km. Well something is better than nothing.
ibs already work kar raha BBK-Mur section may usmay kya add hoga bhai ?
Sitapur-burwal me lagayenge aur jo baaki bacha hui.. wahi previous hai kaam.