Tumakuru - Arsikere and Chikkajajur - Yalavigi Doubling updates.
-
-
Tumakuru to Kardi.
-------------------------------
-...
more...
-
-
Tumakuru to Kardi.
-------------------------------
-...
more...
5 Posts
JRU - THN target was last year, then now it's this Sep.
-
From JRU onwards everywhere work is on, but it wont be completed anytime soon.
At MYK major station modifications is on.
At...
more...
-
From JRU onwards everywhere work is on, but it wont be completed anytime soon.
At MYK major station modifications is on.
At...
more...
Maga, THN-HRR doubling target wont include Tungabhadra bridge, bridge comes just after HRR.
Did u check Sasalu, they have to construct new tracks for iron-ore loading along with new platform.
Was it Vishwamanava Exp which u travelled in ?? its a damn good train, we can easily get a good window seat with not much ruch, excellent for railfanning.
Did u check Sasalu, they have to construct new tracks for iron-ore loading along with new platform.
Was it Vishwamanava Exp which u travelled in ?? its a damn good train, we can easily get a good window seat with not much ruch, excellent for railfanning.
Yes.
But still many minor RUBs are pending and then the bottleneck of DVG with its antiquated signalling.
-
It already has one line on the left isn't it for the loading?
Then one...
more...
But still many minor RUBs are pending and then the bottleneck of DVG with its antiquated signalling.
-
It already has one line on the left isn't it for the loading?
Then one...
more...
DVG station & city limits can be a major bottleneck for THN-HRR doubling.
Yes total 4 tracks at Sasalu, there are two tracks left of main line of which one will be made main line. And I think they are constructing new PF for that track. So a new 3rd PF track will be constructed along with the existing line for loading ore.
Yes total 4 tracks at Sasalu, there are two tracks left of main line of which one will be made main line. And I think they are constructing new PF for that track. So a new 3rd PF track will be constructed along with the existing line for loading ore.
So the old British era building is gonna be demolished and a new station building at 3 stations including YLG to be built click here