Blog Entry# 3801557
Posted: Sep 12 2018 (22:28)

10 Responses
Last Response: Feb 09 2019 (10:38)
Info Update
35825 views
17

★★
Sep 12 2018 (22:28)   NTR/Nittur (2 PFs)
SingleTraveller^~
SingleTraveller^~   3246 blog posts
Entry# 3801557            Tags  
Tumakuru - Arsikere and Chikkajajur - Yalavigi Doubling updates.
-
-
Tumakuru to Kardi.
-------------------------------
-
...
more...

Tumakuru - Gubbi is the target for this year.
-
After TK station, immediately new line is being laid on the right as said before in an another post.
The new line is laid for some distance, then gaps and again laid intermittently.
Some places ballast in spread with sleepers, some places nothing - just the old status of land being levelled and left. One or two places minor bridges are yet to be constructed.
-
Some stations new PFs are built but the line is yet to be laid.
Some stations, as I will post in subsequent blogs, the new PF is being used and the old PF's line is uprooted in total and new line is being laid, and the new is being used now.
Guess new PF lines being considered as loops doesn't need CRS.
No signs of signals.
-
I doubt if this year's target will be met.
-
-

Translate to English
Translate to Hindi

5 Posts

16690 views
8

Sep 14 2018 (01:10)
SingleTraveller^~
SingleTraveller^~   3246 blog posts
Re# 3801557-6               Past Edits
JRU - THN target was last year, then now it's this Sep.
-
From JRU onwards everywhere work is on, but it wont be completed anytime soon.
At MYK major station modifications is on.
At
...
more...
KAG the new PF line is being used and the old one is totally removed.
At THN PF2 is made into an island PF.
-
THN - HRR is also for this year, but surely it will not be completed. The biggest hurdle is the bridge over Thungabhadra, where even pillars are not ready.
-
At DVG the bottleneck towards UBL needs to be sorted out to lay another track. Also I saw that the cabin has the old type lever type of track switching.
Just some ROB is under construction.
-
Was surprised to see the new line towards KTY having a speed of 80!
-
Pics 30, 31 - I noticed a new station just recently - - KMPS. It turned out be just a small station from where an industry line deviates.
-
The pillar construction is completed for the bridge over Varada river.
-
Yalavigi has still the old British era station building.
Travel tip - /blog/post/3804898
-

Translate to English
Translate to Hindi

9734 views
2

Sep 14 2018 (06:10)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10624 blog posts
Re# 3801557-7               Past Edits
Maga, THN-HRR doubling target wont include Tungabhadra bridge, bridge comes just after HRR.
Did u check Sasalu, they have to construct new tracks for iron-ore loading along with new platform.
Was it Vishwamanava Exp which u travelled in ?? its a damn good train, we can easily get a good window seat with not much ruch, excellent for railfanning.
Translate to English
Translate to Hindi

9560 views
1

Sep 14 2018 (10:31)
SingleTraveller^~
SingleTraveller^~   3246 blog posts
Re# 3801557-8               Past Edits
Yes.
But still many minor RUBs are pending and then the bottleneck of DVG with its antiquated signalling.
-
It already has one line on the left isn't it for the loading?
Then one
...
more...
mainline and one PF line. All of them spread out at a distance.
One new double line is to the left of the current mainline, I think, which I didn't get up to see.
-
Yes,
-

Translate to English
Translate to Hindi

9149 views
2

Sep 14 2018 (16:47)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10624 blog posts
Re# 3801557-9               Past Edits
DVG station & city limits can be a major bottleneck for THN-HRR doubling.
Yes total 4 tracks at Sasalu, there are two tracks left of main line of which one will be made main line. And I think they are constructing new PF for that track. So a new 3rd PF track will be constructed along with the existing line for loading ore.
Translate to English
Translate to Hindi

8347 views
0

Feb 09 2019 (10:38)
SingleTraveller^~
SingleTraveller^~   3246 blog posts
Re# 3801557-10              
So the old British era building is gonna be demolished and a new station building at 3 stations including YLG to be built click here
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy