Search Forum
Blog Entry# 4015589
Posted: Nov 17 2018 (19:28)
73 Responses
Last Response: Nov 19 2018 (15:54)
73 Responses
Last Response: Nov 19 2018 (15:54)
Nov 17 2018 (19:28) BAY/Ballari Junction (Bellary) (4 PFs)
SteelCityRF^~
SteelCityRF^~ 27541 blog postsRail fanning at #BallariJnouter (towards Guntakal side) on #November15th2018
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
75 Posts
While googling found some info regarding P-Way track maintenance so go through it if interested @ click here
I'm not sure ..just guessing..thanks information about that curvature lines ..Looks like small 7 lakh work need not to worry too much ..I think..
As informed by Prem /blog/post/4015589 that work will be happening at BTPS