Railway Board has instructed RVNL to begin electrification from Kalaburagi to Bhigwan by Jan 2019
3 Posts
Good decision. Due to this small portion without electrification, a lot of time is given at Daund and Wadi/Guntakal for trains heading South.
If they will start from Solapur end, till the time they reach Wadsinge on one side and Boroti on other, doubling would have advanced further
Doubling and electrification complete can saveing time and speed increase possible
That's right. By the end of this year we'll probably have only 27 km of single line remaining to be doubled between Hotgi and Gulbarga. So this is the right time to begin electrification.