******MOST IMPORTANT NEWS******
1.MALB-WKR electrification has started. Poles have been installed. Spotted by me. The poles are high rise OHE. Please update the same.
2. Talked with officials on GIMB. Electrification is confirmed. And soon work would start on SIOB-VG section
Thanks.
1.MALB-WKR electrification has started. Poles have been installed. Spotted by me. The poles are high rise OHE. Please update the same.
2. Talked with officials on GIMB. Electrification is confirmed. And soon work would start on SIOB-VG section
Thanks.
20 Public Posts - Sat Mar 23, 2019
3 Public Posts - Sun Mar 24, 2019
Preparatory Work under progress for starting OHE wiring in Wankaner - Dahinsara - Maliya Miyana section