Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

For RailFans, seeing RAC-1/2/3 in Mumbai-UP Trains is more exciting than Election Results - rdb

Search Forum
<<prev entry    next entry>>
Blog Entry# 4310643
Posted: May 06 2019 (20:48)

33 Responses
Last Response: May 07 2019 (02:56)
Rail News
17657 views
0

Other News
BULT/Bullet Train
May 06 2019 (20:48)   बुलेट ट्रेनच्या कामाला वेग

Punekar^~   648 news posts
Entry# 4310643         Tags   Past Edits
प्रकल्पासाठी लागणारी जमीन मुंबई (५ हेक्‍टर), ठाणे (१३९ हेक्‍टर), पालघर (२८० हेक्‍टर) एकूण जमीन : १४३४ हेक्‍टर (शासकीय जमीन : ४१२ हेक्‍टर तर खासगी जमीन १०२२ हेक्‍टर)गर्दीच्या वेळी...
बुलेट ट्रेनच्या कामाला वेग

61 Posts

6599 views
0

May 07 2019 (01:13)
12268SaurashtraKing~
12268SaurashtraKing~   6201 blog posts
Re# 4310643-63               Past Edits
It involves implementation of a new technology. The pros of this project overshadow the petty cons.
Translate to English
Translate to Hindi

6769 views
1

May 07 2019 (02:53)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 4310643-65              
You should remember first that India has zero experience with bullet trains. We have never dealt with highs speed trains of this sort and we do not possess any of the technical know-how in how it is to be implemented and the challenges that can come up during the regular operations. In this context there are a few things to be taken into consideration before constructing a trial line.
Construction costs - A dedicated high speed corridor is a very difficult and costly construction project. Even on a plain, level terrain like BCT-ADI, it it costing about 1 lakh crore rupees. For more difficult terrain like the Deccan plateau (like Delhi-MAS/SBC or CST-HWH) it would cost much more. It would be completely
...
more...
pointless to spend lakhs of crores on all these more complex routes even before we become familiar with the technology.

Translate to English
Translate to Hindi

6641 views
1

May 07 2019 (02:56)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 4310643-66              
Ease of construction and business - Like I said above, since this is an experimental line, the optimum route should have very easy terrain. Pretty much, only three routes (with important cities on them) satisfy these conditions.
The BCT-ADI route, the Delhi-CNB/ALD route and the east coast route from MAS to HWH. The MAS-HWH route is too long to be a viable experimental line, and that leaves us with the BCT-ADI route and the Delhi-CNB route.
Now the clientele for the Bullet train would be the business class, which would normally prefer
...
more...
flight journeys. And this kind of clientele is more abundant on the BCT-ADI sector with a considerable amount of business class traffic.
So, as an experimental line, for a proof-of-concept and also in terms of potential revenue, BCT-ADI would be the best option for a long distance bullet train experiment.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy