Search Forum
Blog Entry# 4368446
Posted: Jul 04 2019 (10:02)
6 Responses
Last Response: Jul 04 2019 (18:46)
6 Responses
Last Response: Jul 04 2019 (18:46)
New Facilities/Technology
SCR/South Central
Reva18~ 4104 news posts
Vijayawada: The railway division of Vijayawada commissioned the longest electrified tunnel in India on Wednesday. The 6.6 km tunnel stands as an engineering marvel situated between...
1 Posts
There is NO connection between Kasumur and Venkatachalam. Reversal will be required @Venkatachalam Road Junction
2nd longest (operational)
Sangaldan tunnel is not yet operational
Sangaldan tunnel is not yet operational
Y connection at Venkatchalam Jn. must be done so that NLR-HX Train service avoiding Gudur-Renigunta-Reversal-Nandalur line can be started.