Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

For RailFans, seeing RAC-1/2/3 in Mumbai-UP Trains is more exciting than Election Results - rdb

Search Forum
<<prev entry    next entry>>
Blog Entry# 44262
Posted: May 25 2010 (19:45)

14 Responses
Last Response: Jul 24 2022 (18:29)
48697 views
1
May 25 2010 (19:45)  
guest   0 blog posts
Entry# 44262              
1 compliments
Initial IRI Forum Glimpse.
What is the use of "pit line"?Is there any relation of no. of pit lines with number of trains originating or terminating at terminus station?
Translate to English
Translate to Hindi

4 Public Posts - Tue May 25, 2010

109346 views
3

May 25 2010 (22:03)
Vinay Kumar   23030 blog posts
Re# 44262-6              
@guest: Entry# 44262
Pit Line are washing lines with open dumping pit at base, throughout the track.
- These pit are utilized to drain out sewage water (Washroom & Coach Interior Cleaning).
- Thorough Checking & Repairing Coach Base parts
-
...
more...
Newer Pit Line are equipped with water pressure cleaning facility, to wipe out exterior of coaches!!
#Is no of Pit Line dirctly proportional to no. of train originating??
Yeah, it does!!
But that depends on many factors like,
1. Pit Line Capacity & Efficiency- Single Pit Line with 24 Coach Handling Capacity can easily manage more trains, when compared with Pit Line of 10-15 Coach Capacity
eg. LKO Pit Line manages LKO Mail & Gomti Exp (24 Rake) at one shot, while SLN manages Sadbhawna (18-22 Rake) in two shifts
2. Primary vs Secondary Maintenance Depot - If the Station act as secondary Maintenance Depot for most originating trains, Low Count of Pit Line can manage increased numbers.
eg. NDLS/NZM is secondary maintenance point for most DRNTO & so no extra Pit Line required for DRNTO.
3. Train Run - Station having Intercity trains as originating/terminating point can manage with lesser Pit Line, while opposite for long running train's station.
eg. LKO vs LJN - LKO do have intercity as originating/terminating point & so is managing with existing Pit Line, while LJN got many long run trains recently & so got 5 Pit Line recently!!
4. Train Timing - If trains' departing time are close (withle difference between Arrival and Departure), with increasing no, then saturation point may achieved faster (with limited no of Pit Line). Then either
- Newer Pit Line need to be installed or
- Switching of train to nearby station or
- Weekly Train will remain Weekly or
- Non-introduction of train or
- Non-managed & unclean rake would become practice
etc etc

Translate to English
Translate to Hindi

7 Public Posts - Wed May 26, 2010

2 Public Posts - Sun Jul 24, 2022
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy