Oct 21 2019 (19:32) 57515/Daund - Hazur Sahib Nanded Passenger | KPG/Kopargaon (3 PFs)
Dewang
Dewang 218 blog posts2 Posts
YL-KPG commissioned ..... But still trains from YL come on Home PF No 1 rather on Main Line PF No 2
PF No 2 of KPG is used only if required. That is when 2 trains are going to stop at KPG, then only PF 2 will hold a train.
general trend I observed is
1) if both the trains are equally IMP, then PF 1 will hold MMR bound train and PF 2 will hold DD/SNSI bound train.
2) IMP train will be...
more...
general trend I observed is
1) if both the trains are equally IMP, then PF 1 will hold MMR bound train and PF 2 will hold DD/SNSI bound train.
2) IMP train will be...
more...
Agreed .... But when Doubling is completed of YL-KPG standard SOP should be PF 2 is UP Main and DD-SNSI should be used ... But as KPG - ANG doubling is yet to commence the train still come at PF1... Also I saw the UP Main has point towards PF1 .... Hence it is used for Double line commenced towards PF1