Search Forum
Blog Entry# 4467247
Posted: Oct 24 2019 (00:35)
28 Responses
Last Response: Oct 28 2019 (11:30)
28 Responses
Last Response: Oct 28 2019 (11:30)
The existing and revised timings of Hyderabad-Hazrat Nizamuddin-Hyderabad Dakshin Express and train from January 23
2-3AC
3 Sleeper
1 General coaches will be added.
The train will have 22 coaches, including 1 PC, 1-2AC, 3-3AC,10...
more...
2-3AC
3 Sleeper
1 General coaches will be added.
The train will have 22 coaches, including 1 PC, 1-2AC, 3-3AC,10...
more...
24 Posts
Round trip distance 3500km kante ekkuva aithe, distination station lo kuda pit lines ki pampinchi full maintenance cheyyali (This is called SM). So, Amritsar/JAT ki extend chesina minimum 6-7 hours turn around time kavali.
Ok. So what is difference between PM and SM?
Sm lo kuda complete checking jarugutunda?
Sm lo kuda complete checking jarugutunda?
so. 12722 will get a speed up of 15 mins making it cover 1673 kms in 29 hrs 45 mins @ 56 kph. Further 15 mins speed up possible in SC-HYB part
Rendu almost same. Renditlonu pit lines ki teesukelli full maintenance chestaru.
PM ante rake arrange chesina zone CDO lo cheedhi. SM ante destination lo chesedhi.
For example, 12721/22 rake owner HYB CDO di, so it is the 'primary' depot. So, HYB lo jarigaedhi primary maintenance. Delhi just destination anthe, so NZM lo maintenance chesthe danni 'secondary' maintenance antaru.
SM is not...
more...
PM ante rake arrange chesina zone CDO lo cheedhi. SM ante destination lo chesedhi.
For example, 12721/22 rake owner HYB CDO di, so it is the 'primary' depot. So, HYB lo jarigaedhi primary maintenance. Delhi just destination anthe, so NZM lo maintenance chesthe danni 'secondary' maintenance antaru.
SM is not...
more...
Chalo accha hai isme general coachs to badaya