Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vaigai வந்துருச்சு, ஆசையில் ஓடி வந்தேன்

Search Forum
<<prev entry    next entry>>
Blog Entry# 4486994
Posted: Nov 13 2019 (14:01)

7 Responses
Last Response: Nov 13 2019 (14:32)
Rail Fanning
16091 views
15

★★
Nov 13 2019 (14:01)   15026/Anand Vihar Terminal - Mau Express (Via Ayodhya Cantt) | MAU/Mau Junction (3 PFs)
TouristerDivyanshu^~
TouristerDivyanshu^~   172564 blog posts
Entry# 4486994            Tags  
Electrification updates of Mau, newly built washing line (1 day temporary maintainance of ANVT-MAU etc)
Also electrification is in progress for phephna-indara line too which will be completed at same time of arj-mau-bhatni
.
Wiring is going on 2 weeks ago at full pace, expected kV charge by month end and CRS in December may be if substations finishing work will be done
...
more...
along with engine trial..
Elocos from new year is expected..
Dozens of trains will get eloco like Lichchavi, gorakpur intercity, chappra intercity, bapudham, purvanchal, many passengers, kashi express, durg nautanwa etc as katni-satna section will also electrified at same time so gkp bound trains going to that side will also run on elocos
.
Meanwhile Shahganj-amh-mau section not yet electrified and no work has been done so far, new tender proposed as earlier one have some design faults due to semaphore signalling at azamgarh and few other problems..
It take almost 9 months more to electrfiy that section.
As long as doubling, it will be completed by 2024 for ARJ-BHATNI exc. Mau-indara
2022 for Indara-Phephna
No idea about Azamgarh-shahganj..
Memus will replace passengers and demus for sure as the section stations height has been raised 2 years back and some work for station also going in indara-bhatni section..
Mps is 110 for ARJ-BTT but capacity is 130 as per trials..
They had plan to make fast section for BSB-GKP so that 1 can easily reached to GKP/BSB from BSB/GKP in time about 4 hours or less (future proposals)
.
Mau may get extension of bsb bound train or new train due to newly built washing line and to ease congestion at BSB
.
Thanks

Translate to English
Translate to Hindi

4 Posts

7050 views
1

Nov 13 2019 (14:26)
way_thelong^~
way_thelong^~   8848 blog posts
Re# 4486994-5              
Take Kamayani for your Mumbai bound service with giving BSB a Humsafar till LTT/CSTM
Translate to English
Translate to Hindi

7197 views
1

Nov 13 2019 (14:30)
TouristerDivyanshu^~
TouristerDivyanshu^~   172564 blog posts
Re# 4486994-6              
Yeahh.. thats good too
As kamayani was going to CPR in last to last year IRTTC proposal but stopped
Translate to English
Translate to Hindi

7092 views
2

Nov 13 2019 (14:32)
TheRailRoute^~
TheRailRoute^~   10020 blog posts
Re# 4486994-7               Past Edits
1. Sabarmati Exp
2. Kamayani Exp
3. MUV Exp
But still, these are an assumption
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy