Search Forum
Blog Entry# 4515243
Posted: Dec 16 2019 (15:53)
4 Responses
Last Response: Dec 17 2019 (00:47)
4 Responses
Last Response: Dec 17 2019 (00:47)
Commentary/Human Interest
NER/North Eastern
KhagariaJn^~ 468 news posts
- वाराणसी स्टेशन पर जनवरी से शुरू होना है नॉन इंटरलॉकिंग का काम, बढ़ेंगी पैसंजर्स की मुसीबतें
-रेलवे...
-रेलवे...
7 Posts
Shifting will help to IR to run it more punctual and better
At MUV all the basic facilities with world class level is present as compare to BSB which lacks..
MUV is also well connected with whole Varanasi City..
Even Cantt has lots of problems, specially outside road problem, no cabs available from past few months due to construction of overbridge
At MUV all the basic facilities with world class level is present as compare to BSB which lacks..
MUV is also well connected with whole Varanasi City..
Even Cantt has lots of problems, specially outside road problem, no cabs available from past few months due to construction of overbridge
Yes.
Good Decision taken by IR by Shifting it to MUV.
After Doubling & Auto Signalling Work On MUV-ALD Stretch, Vande Bharat would get 130 MPS & some travel time would be reduce by 20-30 mins during its entire journey in both directions.
Let's hope....
Good Decision taken by IR by Shifting it to MUV.
After Doubling & Auto Signalling Work On MUV-ALD Stretch, Vande Bharat would get 130 MPS & some travel time would be reduce by 20-30 mins during its entire journey in both directions.
Let's hope....