Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Kamayani Express - Late आना है काम तुम्हारा लेकिन मैं फिर भी हूँ तुम्हारा दीवाना - Aman

Search Forum
<<prev entry    next entry>>
Blog Entry# 451610
Posted: Jun 11 2012 (19:40)

3 Responses
Last Response: Jun 11 2012 (19:50)
2698 views
0

Jun 11 2012 (19:40)   NGP/Nagpur Junction (8 PFs)
 
guest
Entry# 451610            Tags  
Its really a good news that a big junction like nagpur getting NEW RRI system.
*************
OPERATIONAL BENEFITS OF NEW RRI.
• Operational flexibility will be greatly enhanced as signaled movements increase from 369 to 533 in new RRI.
...
more...
At Ajni end DN goods loop line 1 & 2 will be converted into UP &DN goods lines giving more operational options.
• All four goods loop in NGP yard will be made common loops facilitating additional flexibility of dispatch and reception of goods train.
• In new RRI run through facility has been provided from NGP goods yard to Ajni goods yard.
• Addition route given for dispatch of train from platform 4,5 & 6 towards Itwari side o­n Howrah end.
• Speed restriction due to D-16 will be removed.
• Provision of calling o­n signals o­n goods line starter will be additional operational flexibility
• Goods cabin will be merged with new RRI saving manpower.
• Simultaneous movement of dispatch from platform 6 towards Howrah/Itarsi permitted while reception of down train o­n platform 4 which is presently not available.
• Simultaneous shunting into RMS/parcel siding while admitting train from Ajni into goods yard permitted which is restricted in existing.
• Simultaneous movement of dispatch/reception o­n platform 7 from ET permitted while reception/dispatch of trains towards HWH from goods yard which is presently restricted.
• Simultaneous reception of UP trains o­n platform 6 from ET/HWH permitted while reception/dispatch from platform 7 towards Ajni which is presently restricted.
• Provision of decentralized crank handle at 3 locations while presently they are to be taken from RRI.

SAFETY BANEFITS:
• Removal of non standard diamonds D-16 and D-17.
• Axle counter will be installed in double diamond to detect track occupancy.
• Provision of LED signals will enhance visibility.
• Crank handles have been interlocked which was not in existing RRI.
• All parallel track circuits will be converted into series for safety.
• NKR/RKR indication provided for points.
-----From new forum.

Translate to English
Translate to Hindi

1491 views
0

Jun 11 2012 (19:45)guest
Re# 451610-1              
@451610-0  @guest
So they are removing old diamond crossings.
Translate to English
Translate to Hindi

1628 views
0

Jun 11 2012 (19:48)
MaheshGupta~
MaheshGupta~   3096 blog posts
Re# 451610-2              
@451610-0  @guest
Thanks for the news.
In the morning this blog started with incorrect information.
/blog/post/451133
Translate to English
Translate to Hindi

1570 views
0

Jun 11 2012 (19:50)guest
Re# 451610-3              
Ho ok. But this block not for 5 days. Only for 2 days...
If they extend it , they may come up with more cancellations.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy