Search Forum
Blog Entry# 4518588
Posted: Dec 20 2019 (13:24)
4 Responses
Last Response: Mar 05 2020 (15:55)
4 Responses
Last Response: Mar 05 2020 (15:55)
Dec 20 2019 (13:24) 17243/Guntur - Rayagada Express (PT) | GNT/Guntur Junction (7 PFs)
Srikanth~
Srikanth~ 2329 blog postsThey reduced General coach. They can easily make it 22 coacher without removing general.
9 SL + 9 GEN + 2 AC3 + 2SLR = 22 Coaches will be the prefect CC for this train
They need to stop at many small stations where there is no platform further they operate as passenger between Vskp Parvathipuram which will be not be easy with 22 coaches accelerating and decelerating every 10km. The same rake is being used for GNT SC and is the same case there too.