Blog Entry# 4540630
Posted: Jan 15 2020 (12:20)

5 Responses
Last Response: Jan 15 2020 (16:31)
General Travel
4420 views
3

Jan 15 2020 (12:20)   TK/Tumakuru (Tumkur) (5 PFs)
SWRailway^~
SWRailway^~   13342 blog posts
Entry# 4540630            Tags   Past Edits
Electrification work in Chikkabanavar - Tumkur - Hubballi section may begin anytime. According to sources by October end BAW - TK stretch will be electrified. Hope after electrification mps will be increased to 110 kmph at present trains do only 95 kmph after Tumkur only trains hit 100-105 kmph.
Source : KRU
Translate to English
Translate to Hindi

1 Posts

2090 views
0

Jan 15 2020 (12:45)
promethsuresh^~
promethsuresh^~   3536 blog posts
Re# 4540630-2              
Electrification will take minimum 5 years
Translate to English
Translate to Hindi

2116 views
0

Jan 15 2020 (12:49)
SWRailway^~
SWRailway^~   13342 blog posts
Re# 4540630-3              
No sir. There is lots of political pressure to complete within 2 years and in tenders deadline given is 28-36 months. It will be divided into 2 or 3 independent sections for faster completion
Translate to English
Translate to Hindi

1992 views
0

Jan 15 2020 (16:19)
promethsuresh^~
promethsuresh^~   3536 blog posts
Re# 4540630-4               Past Edits
I highly doubt how much ever political pressure you put look at doubling they started it almost 10 years ago and still only 40-50% completed.Doubling needs to be completed because it will increase capacity of the existing lines even speed and punctuality of trains can be increased and even new trains can be run and no point of hurrying the electrification process. There should be sufficient amount of electric locomotive as well to cater to the demand and for KJM ELS DLW, DMW, CLW have still not started allocating electric locomotives.
Translate to English
Translate to Hindi

1957 views
1

Jan 15 2020 (16:25)
RohanPaul^~
RohanPaul^~   5854 blog posts
Re# 4540630-5               Past Edits
doubling take time because land acquisition and other construction etc.Electification complete very faster than doubling.As said by Vageesh it will divide into parts as like Gulbarga-Bhigwan.And also after conversion of kjm DLS to ELS will get loco allocation.
Translate to English
Translate to Hindi

1881 views
0

Jan 15 2020 (16:31)
SWRailway^~
SWRailway^~   13342 blog posts
Re# 4540630-6              
Even if KJM wont get electric locos RPM can alone handle supplying locos for entire SWR but dont worry in this year DLW and CLW will allot WAP-7s to KJM
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy