As you all know SWR has only 16.63% of it's route Electrified and much money is alloted for these in the annual budget
Which of the following route should be given most priority and Electrified as QUICKLY as possible
Which of the following route should be given most priority and Electrified as QUICKLY as possible
NO vote
Bengaluru(Chickbanavar)-Talguppa
0%
0
Bengaluru(Chickbanavar)-Miraj (Via Hubballi.Belgavi)
71%
25
Hospete-Vasco Da Gama (including castle rock-kulem)
17%
6
Hotgi-Gadag
3%
1
Rayadurga-Chickjajur
0%
0
Mysuru-Chamarajnagar
0%
0
Bengaluru(Chickbanavar)-Mangaluru(Padil) (Via Kunigal)
3%
1
Bengaluru(Bypl)-Omalur (Via hosur)
3%
1
Bengaluru(Yelahanka)-Bengaluru airport halt-Devanahalli
3%
1
Any other citing reasons (If any)
0%
0
8 Posts
Ballari-Ryadurgam-CTA- JRU can be used for Eloco even if BAW-UBL not get RE like how GTL-BAY section using Eloco at present conditions.about Talguppa-Birur its not much of use until complete BAW-Birur Get RE
Trains can run with electric locos if Ballari - Chikjajur section is electrified and Chikkabanavara - Chikjajur section is not electrified as follows:
🔹57451/57452 - Chikjajur - Guntakal - Chikjajur Passenger: This train can with end to end electric loco (if it is not converted into DEMU)
🔹56909/56910 - KSR Bengaluru - Hosapete - KSR Bengaluru Passenger: Diesel loco from KSR Bengaluru to Chikjajur and electric loco from Chikjajur to Hosapete and vice versa
🔹16229/16230...
more...
🔹57451/57452 - Chikjajur - Guntakal - Chikjajur Passenger: This train can with end to end electric loco (if it is not converted into DEMU)
🔹56909/56910 - KSR Bengaluru - Hosapete - KSR Bengaluru Passenger: Diesel loco from KSR Bengaluru to Chikjajur and electric loco from Chikjajur to Hosapete and vice versa
🔹16229/16230...
more...
Piggybacking is not advisable for such a long distance from BAW to JRU as a single WAP-7 weighs approx of 3 ICF third AC coaches and will be more load for a single WDP-4D to haul for 266 kms as this section is full of steep gradients plus Gubbi Kardi section is a single line with numerous TSRs. This was the same reason why Karnataka got back diesel link from SBC to DD as it was like a single WDP-4D pulling 28 coach train as it took hell of a time to accelerate and reach mps. Yes if twin alcos are provided then piggybacking is possible but again the train will be too lengthier.
I said generally what can be done. If piggy backing cannot be done, then 16229/16230 and 82653/82654 will run with diesel loco from SBC/YPR to BSB/JP. That is why I said if BAW - JRU - DVG - UBL section is not electrified then it will not be of much use even if BAY - JRU section is electrified because only BAY and JRU are capable of doing LC in entire BAY - JRU section