Search Forum
Blog Entry# 4681359
Posted: Aug 04 2020 (22:31)
15 Responses
Last Response: Aug 05 2020 (16:09)
15 Responses
Last Response: Aug 05 2020 (16:09)
New Facilities/Technology
SR/Southern
GondiaSamnapurE~ 183 news posts
Whenever the old makes way for the new, there can be a sense of missing something that has been around for years. A sense of looking...
10 Posts
Watch the 2nd video. The bridge is only a few feet above water level, even lower than the Pamban bridge.
In fact, I think the arrangement in the 2nd video is the one that the new Pamban bridge will use.
In fact, I think the arrangement in the 2nd video is the one that the new Pamban bridge will use.
The new bridge will be 3 meters higher from the sea level than the existing old bridge. The new bridge will be a double line bridge with alignment for double track in future with electrification
Cross sectional diagram of new pamban bridge showing doule line and OHE arrangements.
Electrification will increase cost by roughly 400 crores. Same magic actually failed in japan 7 years back . Going by india red tapes in railway still exits. So no chance no place lets just sink in