Search Forum
Blog Entry# 4798581
Posted: Dec 01 2020 (22:50)
8 Responses
Last Response: Dec 04 2020 (20:21)
8 Responses
Last Response: Dec 04 2020 (20:21)
Dec 01 2020 (22:50) 02137/Punjab Mail Special (PT) | CSMT/Mumbai CSM Terminus (18 PFs)
Snehashish_railfan^~
Snehashish_railfan^~ 25136 blog posts3 Posts
LHB SLR Non-AC Coach got underslung DG set on Fiat Bogies which is allowed 130 KMPH speed restriction!!
Complete Oscillation trial was/is conducted on AGC-PWL Section for 145 KMPH but Regular certification honored for 130 MPS (GZB-MGS /AGC-PWL & then all BG)!!
Complete Oscillation trial was/is conducted on AGC-PWL Section for 145 KMPH but Regular certification honored for 130 MPS (GZB-MGS /AGC-PWL & then all BG)!!
I wonder if the hotel load between BTI-FZR will be on the lone EOG or will an HOG enabled 4D will be used.
Underslung DG Set!! "The diesel-generating set is now mounted under the under frame of the COACH"
LHB SLR is equipped to tackle Hotel Load for LHB Rake!!
click here
LHB SLR is equipped to tackle Hotel Load for LHB Rake!!
click here