Masagram/SER station under wires.
"Electrification of Bankura-Masagram Single line section"
#BDR series
"Electrification of Bankura-Masagram Single line section"
#BDR series
12 Posts
Yes that can be done. Maybe that will be done on temporary basis till Flyover gets completed. But before that 4th line must be completed first. All depends on ER how they will work. SER has nothing to do, SER already had talked many times with ER about this connection. Lets see how fast it works. Very much needed one.
New MEMU rakes toh order hoye gache na ei route er jonno?
Sunchilam February 2021 a inauguration hote pare BQA-MSAE route a electrified train.
Sunchilam February 2021 a inauguration hote pare BQA-MSAE route a electrified train.
Hain. New AC 3 phase MEMU rakes ADRA division er jonno order giyechilo. Ei section e CRS kobe hoi tar opor sob kichu. Asha kori Feb er moddhe inauguration hobe.
Yes a temporary connection to HBC will be better. But I think the construction of EDFC and upgrading HBC operating speed to 160kmph will delay the flyover connection.
There is immediate need of a connection. They can't wait for years for them to complete. ER knows about it. This will reduce travel time to BQA by 1 to 1.5 hrs.