Feb 19 2021 (12:56) 01447COV/Shaktipunj Special (PT) | BRKA/Barkakana Junction (6 PFs) | GMO/WAP-7/39067
ShivShyam~
ShivShyam~ 530 blog postsOn-time running Shaktipunj Exp waiting for reversal with Gomoh WAP - 7 # 39067 at the helm.
Location: Barkakana Jn, Ramgarh, Jharkhand
Date: 22nd January 2021
Time: 1741 hrs
Location: Barkakana Jn, Ramgarh, Jharkhand
Date: 22nd January 2021
Time: 1741 hrs
Like Barauni, ECR should construct platform on main line (Ranchi road - Patratu). So that rake reversal can be avoided
Ptratu is already constructed but not frequently connected with ranchi and ranchi road in under construction which is in Ramgarh and 24*7 connected with ranchi!!!
Like Barauni, ECR should construct platform on main line (Ranchi road - Patratu bypass line) of Barkakana. So that rake reversal can be avoided at barkakana