Search Forum
Blog Entry# 49353
Posted: Jun 09 2010 (12:23)
1 Responses
Last Response: Jun 09 2010 (12:30)
1 Responses
Last Response: Jun 09 2010 (12:30)
Few Questions
Hi friends there are few things that I would like to know about this train
Firstly whether the non ac sleeper classes turn out to be a heaven for eunuchs during its journey or syops like other express/mail trains or not...secondly what are duration of the technical stops......finally whether water filling in the toilets are done during the stops or not.....plzzz someone do answer....
Hi friends there are few things that I would like to know about this train
Firstly whether the non ac sleeper classes turn out to be a heaven for eunuchs during its journey or syops like other express/mail trains or not...secondly what are duration of the technical stops......finally whether water filling in the toilets are done during the stops or not.....plzzz someone do answer....
I do not know for this train, but for HWH - YPR duronto, eunuch problem was there as reported by bloggers earlier. Duration for technical stoppages can be 10 min/15 min. Yes, water filling, loading of food ios done at these technical halts.