Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans - once you meet them, friends for life

Search Forum
<<prev entry    next entry>>
Blog Entry# 4990669
Posted: Jun 20 2021 (12:15)

86 Responses
Last Response: Jun 24 2021 (10:34)
General Travel
34210 views
4

Jun 20 2021 (12:15)   PNBE/Patna Junction (10 PFs)
Prometheus^~
Prometheus^~   15213 blog posts
Entry# 4990669            Tags   Past Edits
1 compliments
😂😂😂😂😂😂
I want to ask one query to every ECR members.. We know that ECR zone have Slack problem... Now the thing how can ECR solve this problem as soon as possible... As we know that traffic will increase year by year so Slack will also Remain constant... Give your opinion..
Translate to English
Translate to Hindi

81 Posts

8150 views
3

Jun 20 2021 (17:35)
Railfan_bihari
Railfan_bihari   5266 blog posts
Re# 4990669-82               Past Edits
And btw doubling and electrification has no effect on average speed of trains so thats illogical to say that average speed of trains increase after doubling and electrification.. the Entire BJU-MFP-CPR-GKP-LKO stretch is double and electrified today but still all the traiins are running following the same old single line timetable...
Translate to English
Translate to Hindi

7741 views
1

Jun 20 2021 (17:52)
Prometheus^~
Prometheus^~   15213 blog posts
Re# 4990669-83              
Kafi saare valuable replies ke baad yahi conclusion nikal rha h ki ECR m slack ke bahut saare reason h..

High Traffic density
Highly population area
Week infrastructure
Lack
...
more...
of doubling tracks
Lack of Terminal Facility
Weakness of track soil

And most imp and simple reason is ECR Zone intension

Translate to English
Translate to Hindi

6790 views
0

Jun 20 2021 (18:23)
SGP~
SGP~   8777 blog posts
Re# 4990669-84              
remove politicians from railway, railway apne aap track pe ayega
Translate to English
Translate to Hindi

8344 views
4

Jun 20 2021 (23:01)
Magadh~
Magadh~   9801 blog posts
Re# 4990669-85              
IRIians call it SLACK.
Railways say it - Engineering Allowance + Traffic Allowance.

Railway Board has put a cap on the Engineering Allowance per 100 kms of section.

But,
...
more...
left "Traffic Allowance" to be decided by the CPTM/zone, and that's why some of the zones / CPTMs misuse this. ECR is on top of that list.

For example - Train 02872 has 73 minutes of Traffic Allowance in last 36 kms of it's journey between DNWH and IPR.
Engineering allowance is kept just around 10 minutes.
So, basically the point raised by you can simply get resolved if the CPTM follows the guidelines for table tabling (which is shared in every IRTTC meet).

I just scrolled through the replies on this post and found members suggesting ways to decongest RJPB / DNR.
For everyone's kind attention - I daily see, trains like 02393 and 02309 getting placed at RJPB platform just 4 hours in advance. Last week, I got down at RJPB from Magadh 02871 at RJPB PF3 and found my connecting train 02393 already placed at PF2 (it was 17:00 around), and a PF vendor told me that it was placed around 16:00 along with 02309 at RJPB PF1, and their departure time is around 19:30. So, this way operations team @ DNR creates congestion. CONGESTION is just a man made creation at ECR.

Translate to English
Translate to Hindi

4187 views
1

Jun 24 2021 (10:34)
Anmol^~
Anmol^~   346 blog posts
Re# 4990669-86              
Then no train will be cancelled
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy