A big surprise for Dhanbad and on the much awaited PEH bypass. Thanks to soumyadeep da who arranged the documents , i am posting on behalf of him.
Finally the slot availability and timing shared by SER for train operation between Dhanbad - Tatanagar as per demand grant from ECR.
And PEH bypass is also operational ( check the departure arrival timings )
Finally the slot availability and timing shared by SER for train operation between Dhanbad - Tatanagar as per demand grant from ECR.
And PEH bypass is also operational ( check the departure arrival timings )
117 Posts
Under construction ekhono operational hoe ni, purono diesel loco shed ta ke MEMU carshed banache.
GMO-CRP-BKSC. Danger is the Bridge on Damodar Itself. No danger from Underground fire from Coal Mines
kuch nahi hua hai. dhanbad division khud hi interested nahi hai.