Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Forum
<<prev entry    next entry>>
Blog Entry# 5014937
Posted: Jul 15 2021 (12:11)

34 Responses
Last Response: Jul 23 2021 (08:20)
Info Update
89015 views
18

★★★
Jul 15 2021 (12:11)   DHN/Dhanbad Junction (9 PFs)
guest
Entry# 5014937            Tags   Past Edits
1 compliments
Major info Bro👍👍👍
Some salient features of coaching depots of dhanbad division
////////////////////////////////
1. Coaching depots in Division:
Major :- DHN,GMO,BRKA,SGRL
Other :- KQR,BRWD,CPU,SKTN
//////////////////////////////
...
more...

2. Pitlines:
DHN: 04
Pitline 1 length : 385 metres (17 ICF/16 LHB)
Pitline 2 length : 495 metres (22 ICF/20 LHB)
Pitline 3 length : 555 metres (24 ICF/22 LHB)
Pitline 4 length : 540 metres (24 ICF/22 LHB)
GMO: 01
Pitline length : 370 metres (15 ICF)
BRKA: 01
Pitline length : 313 metres (13 ICF)
SGRL:01
Pitline length : 235 metres (10 ICF)
///////////////////////////////
3. Sick lines status:
DHN :
No of sick lines :- 02 (Old shed) + 02(New Shed)
GMO :
No of sick lines :- 03
BRKA
Not available
SGRL
No of sick lines :- 02
////////////////////////////////
4. Maintenance details of Express & Passenger trains:
DHN :-
PM (Express + Passengers):-
8 (19 Rakes total)
SM
1
GMO :-
PM (Passenger only ):-
2(8 Rakes total)
BRKA :-
PM(Express + Passengers):-
3(8 Rakes total)
SGRL :-
PM(Express only):-
2(4 Rakes total)
KQR,BRWD,SKTN,CPU have no maintenance duties now.
////////////////////////////////
5. List of trains maintained :-
//////////////////////////////
DHN :-
PM
A 13301/13302
DHN-TATA-DHN
Rake 01
B 13303/13304/13319/13320
DHN-RNC-DGHR
Rake 02
C 13305/13306
DHN-DOS-DHN
Rake 01
D 13307/13308
DHN-FZR-DHN
Rake 04
E 22387/22388
DHN-HWH-DHN
Rake 01
F 13329/13330/13331/13332
DHN-PNBE-DHN
Rake 03
G 13351/13352
DHN-ALLP-DHN
Rake 06
H 53323/53324/53334/53327/53328/53333
DHN-SNDT-DHN
Rake 01
I 53339/53340/53341/53342
DHN-CRP-MURI (Cancelled)
Rake 01
SM
11045/11046
KOP-DHN-KOP
RAKE 01
//////////////////////////////////
GMO:-
PM
A 53343/53344/53345/53346
GMO-CPU-PRYJ
Rake 03
B 53347/53348/53349/53350/53351/53352
GMO-BRWD-DOS-BRWD-CAR
Rake 05
//////////////////////////////////
BRKA
PM
A 13347/13348
BRKA-PNBE-BRKA
Rake 02
B 53357/53358
BRKA-DOS-BRKA
Rake 02
C 53365/66/69/70/71/72/73/74/75/76
BRKA-KQR-MDP-KQR-MMD-KQR-BRKA-KQR-BRKA-SDWR-BRKA
Rake 04
///////////////////////////////
SGRL
23347/23348
SGRL-PNBE-SGRL Link
Rake 02
13345/13346
SGRL-BSB-SGRL Intercity
Rake 01
23345/23346
SKTN-BSB-SKTN Intercity Link
Rake 01
////////////////////////////////
6. Rolling in/out Examination points :-
Rolling Hut available at :-
DHN
GMO
BRKA
CPU
Rolling Light available at :-
DHN
GMO
BRKA
CPU
///////////////////////////////
7. Watering points in Division
DHN
Total trains nominated for water filling :- 26
Water facility available at Platforms :- 01 to 06
Water facility not available at Platforms :- 1A,7
GMO
Total trains nominated for water filling :- 32
Water facility available at Platforms :- 01and 02
BRKA
Total trains nominated for water filling :- 12
Water facility available at Platforms :- Information not available
CPU
Total trains nominated for water filling :- 12
Water facility available at Platforms :- 01 to 03
///////////////////////////////////////
Source : click here
/////////////////////////////////////
*** Major works going on SKTN is under full remodeling and to be built as a terminal staton to serve Singrauli region . 2 new platforms are under construction , current PF 1 will become PF 3 in upcoming months.
/blog/post/5010538
(rhythmsofrails)
***Yard map by Rajiv2911

Translate to English
Translate to Hindi
Show AI Response

24 Public Posts - Thu Jul 15, 2021

2 Public Posts - Fri Jul 16, 2021

1 Public Posts - Sat Jul 17, 2021

2 Public Posts - Thu Jul 22, 2021

51573 views
0

Jul 22 2021 (20:28)guest
Re# 5014937-32              
otar actually demand besi. pnme giridih line e traffic valo hobe but dhanbad giridih liner motto hobe na. kotha ache ottake jhajha obdi extend korbe.
dhn e edfc te mainliner freight gulo ke dhukiye debe.
Translate to English
Translate to Hindi
Show AI Response

3 Public Posts - Thu Jul 22, 2021

1 Public Posts - Fri Jul 23, 2021
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy