Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bangalore Namma Metro - ಸ್ವಲ್ಪ ಜಾಗ ಕೊಡಿ

Search Forum
<<prev entry    next entry>>
Blog Entry# 5193333
Posted: Jan 18 2022 (17:48)

14 Responses
Last Response: Jan 27 2022 (22:15)
General Travel
40345 views
6

Jan 18 2022 (17:48)   SMVB/SMVT Bengaluru (7 PFs)
irifan2015~
irifan2015~   2320 blog posts
Entry# 5193333            Tags  
SWR should make loopline linking Hosur YPR bypass line and SMVB YPR main line.
Now that terminal is not yet inaugurated, necessary modifications can be planned and executed.
Such a link loop line will help in running trains from YNK side to Hosur side without loco reversal. Will help in speeding up of trains like LTT CBE.
Translate to English
Translate to Hindi

10 Posts

21802 views
0

Jan 25 2022 (17:59)
irifan2015~
irifan2015~   2320 blog posts
Re# 5193333-11              
Even if right side down ramp is done (remote chances), how will it connect YNK line? LR at KJM?
Translate to English
Translate to Hindi

20098 views
0

Jan 27 2022 (09:02)
Akshay Venugopal   16 blog posts
Re# 5193333-12               Past Edits
I didn't get you!!!

Did you mean the Blue Line?? Actually, that is an existing line...

I meant the Black line which is needed to be made.....
Translate to English
Translate to Hindi

16732 views
0

Jan 27 2022 (14:09)
irifan2015~
irifan2015~   2320 blog posts
Re# 5193333-13              
There are 3 possibilities to link Hosur line to YNK line.
1. Near Lottegollahalli, by way of a bridge across outer ring road. requires more engineering, but definitely possible.
2. Near SMVB terminus. Trains can make a circular route and move to other line. This is what you mentioned as black line. Definitely possible, but will should be there.
3. Near SMVB bypass
...
more...
line, over Kasthuri Nagar from Hosur line to YNK line. Impossible as thickly populated areas. Also this will bypass SMVB. Hence not possible.
My friend suggested a down ramp from Hosur line to KJM station, to which I replied saying that it is not possible and also it won't help traffic to YNK line without loco reversal. Even now, with a loco reversal, at BYPL trains can be operated from Hosur to YNK side and KJM/ WFD side.

Translate to English
Translate to Hindi

12882 views
0

Jan 27 2022 (22:15)
RFIR~
RFIR~   6831 blog posts
Re# 5193333-15              
It wont connect to YNK line....I was looking more from point of view of connectivity between Hosur, Carmelaram towards KJM, Whitefield, BWT...mostly benefiting daily commuters
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy