Search Forum
Blog Entry# 5195631
Posted: Jan 21 2022 (12:03)
21 Responses
Last Response: Mar 08 2022 (17:47)
21 Responses
Last Response: Mar 08 2022 (17:47)
1st LHB from Today.
CC:- DL1 D1 D2 S1 S2 S3 S4 S5 S6 S7 S8 B1 B2 A1 H1 D3 EOG = 17 Coaches
CC:- DL1 D1 D2 S1 S2 S3 S4 S5 S6 S7 S8 B1 B2 A1 H1 D3 EOG = 17 Coaches
17 Posts
DMM early ga vachhina SWR teasukovali ga. Anduke slack pettaru.
Instead can depart late from MTM itself kada with same DMM arrival which is easily possible i believe
Yes SCR can delay at MTM by 60min which they have not done from many years when SWR don't want to have early arrival.
True ..With end to end electrified run..1h speedup can be easily done now and run just ahead of VSG Amaravati from BZA
If 1 hr delayed at machilipatnam, timings not suitable for Nandyal passengers.