Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Search Forum
<<prev entry    next entry>>
Blog Entry# 5391671
Posted: Jun 26 2022 (19:43)

No Responses Yet
General Travel
3722 views
2

Jun 26 2022 (19:43)  
Rajdhani_in_KG_line~
Rajdhani_in_KG_line~   2923 blog posts
Entry# 5391671              
"METROLITE"
LIGHT URBAN RAIL TRANSIT SYSTEM
The metro rail system being developed at present is of high capacity which is required for
, bigger cities with very high ridership and Peak Hour Peak Direction Traffic (PHPDT). Seeing
the
...
more...
success of metro rail in the country, several other cities with lower projection of ridership are also aspiring for rail based mass rapid transit system, which could be fulfilled by Light Urban Rail Transit System named "Metrolite" with lesser capacity at much less cost. 'Metrolite' would also act as feeder system to high capacity Metro. In addition to less capital cost, the operation and maintenance cost of Metrolite would also be less making the system more viable.

FEATURES
a) As far as possible, At-Grade alignment need to be planned to bring down the
civil construction cost and time.
b) AFC gates, Platform screen doors, X-ray baggage scanner and DFMD are not
suggested in the Metrolite shelter. This will remove any signalling and PSD
equipment rooms in the Metrolite shelter platform making it un-attended shelter.
c) Zebra crossings shall be provided on either side of the platforms for passenger
movement from the side foot paths
d) Ticket validators could be installed inside the Metrolite train and shelter with
NCMC / other ticketing systems. With random checking, heavy penalty shall be levied on the passengers without a
valid ticket in the system.
e) Elevated Metrolite system shall be planned only when At-Grade system is not
possible. Concept of Concourse shall be avoided and only Platforms shall be used for
passenger area. Station will be at single level platform with an under bridge
(FOB) below the rail level
f) Ballast-less track proposed in elevated sections and embedded track on road for
At-grade sections
g) The train configuration will he of 3 car unit. Number of additional coaches of
train may be decided by the Metrolite authority based on PHPDT in the
initial design stage itself.
h) Maximum operational speed is 60 KMPH, Up-to 300 number of Passenger loading for 3-coach train unit. @ AW31
loading conditions.
i) The road width occupied by the system "AT GRADE" for single line is
minimum 3.5 m outside shelter location and minimum 5.5 m inside Metrolite
shelter.
j) In case the road width does not permit, one line only can be provided on a
particular road and the other line can be provided on a parallel road also.

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy