Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Malgudi Express: From the pages of RK Narayan to the railway tracks of Mysore. - Vageesh

Search Forum
<<prev entry    next entry>>
Blog Entry# 5461076
Posted: Aug 27 2022 (08:54)

4 Responses
Last Response: Aug 27 2022 (13:40)
General Travel
18491 views
0

Aug 27 2022 (08:54)   12713/Satavahana SF Express
achyutarama
achyutarama   42 blog posts
Entry# 5461076            Tags   Past Edits
Scr is meant for making the passenger trains delay and utmost preference to goods and freight services.
Literally train is crawling and entering into loop line in every station.
Worst controlling of scr
Each and every passenger train get delayed in this entire section.
Shameless
...
more...
officials and traffic controlling people
Though you are getting revenue you made each and every train with uncontrollable delay.
Many complaints raised but shameless responses coming. Freight friendly zone could not even pass daily passenger trains properly.
SCR is meant for mainlines are for freight services and loop lines are for Rajadhani, Superfasts and mail services.
Literally trains are getting so much delaying in this zone
Earlier this train used to reach Warangal by 9 Am punctually and 11:30 to Secunderabad but this is running with huge delay and never reaching before 9:40

Translate to English
Translate to Hindi

13505 views
0

Aug 27 2022 (11:19)
achyutarama
achyutarama   42 blog posts
Re# 5461076-1               Past Edits
Reached warangal 9:51 and left 9:59
Halted and slowed down in between warangal and kazipet
Reached Kazipet at 10:20 luckily started immediately but halted for 5 min at Raghunathapally even then entered into loop line in Zangaon. Again halted at Pembarti for 10 minutes. Can't they check and clear the signal if any express is coming to the station.
Translate to English
Translate to Hindi

12078 views
1

Aug 27 2022 (12:14)
achyutarama
achyutarama   42 blog posts
Re# 5461076-2               Past Edits
Train is crawling charlapalli in utter slow speed now at 12:10 but in NTES SCR people updated that already it reached Secunderabad at 11:57 with 2 min delay. What a pitty and very stupid. They are not utilising the 4 line tracks which is constructed till Ghatkesar.
Translate to English
Translate to Hindi

12230 views
0

Aug 27 2022 (13:03)
achyutarama
achyutarama   42 blog posts
Re# 5461076-3              
Finally train arrived to Secunderabad at 12:50 PM with 55 minutes delay. It was waited at secunderabad outers for 20 minutes
Translate to English
Translate to Hindi

12460 views
2

Aug 27 2022 (13:40)
AnanVskp~
AnanVskp~   23 blog posts
Re# 5461076-4               Past Edits
Yesterday travelled in 12739 VSKP SC Garibrath arrived at SC PF3 at 9.25am but in NTES they updated as arrived SC at 8.30am. To show punctuality SCR especially SC division staff are faking the data for every train. Same story with 12724 NDLS HYB Telangana express daily. Just compare WhereIsMyTrain app data vs NTES.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy