Search Forum
Blog Entry# 5461076
Posted: Aug 27 2022 (08:54)
4 Responses
Last Response: Aug 27 2022 (13:40)
4 Responses
Last Response: Aug 27 2022 (13:40)
Scr is meant for making the passenger trains delay and utmost preference to goods and freight services.
Literally train is crawling and entering into loop line in every station.
Worst controlling of scr
Each and every passenger train get delayed in this entire section.
Shameless...
more...
Literally train is crawling and entering into loop line in every station.
Worst controlling of scr
Each and every passenger train get delayed in this entire section.
Shameless...
more...
Reached warangal 9:51 and left 9:59
Halted and slowed down in between warangal and kazipet
Reached Kazipet at 10:20 luckily started immediately but halted for 5 min at Raghunathapally even then entered into loop line in Zangaon. Again halted at Pembarti for 10 minutes. Can't they check and clear the signal if any express is coming to the station.
Halted and slowed down in between warangal and kazipet
Reached Kazipet at 10:20 luckily started immediately but halted for 5 min at Raghunathapally even then entered into loop line in Zangaon. Again halted at Pembarti for 10 minutes. Can't they check and clear the signal if any express is coming to the station.
Train is crawling charlapalli in utter slow speed now at 12:10 but in NTES SCR people updated that already it reached Secunderabad at 11:57 with 2 min delay. What a pitty and very stupid. They are not utilising the 4 line tracks which is constructed till Ghatkesar.
Finally train arrived to Secunderabad at 12:50 PM with 55 minutes delay. It was waited at secunderabad outers for 20 minutes
Yesterday travelled in 12739 VSKP SC Garibrath arrived at SC PF3 at 9.25am but in NTES they updated as arrived SC at 8.30am. To show punctuality SCR especially SC division staff are faking the data for every train. Same story with 12724 NDLS HYB Telangana express daily. Just compare WhereIsMyTrain app data vs NTES.