Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vaigai வந்துருச்சு, ஆசையில் ஓடி வந்தேன்

Search Forum
<<prev entry    next entry>>
Blog Entry# 5565659
Posted: Dec 07 2022 (23:53)

2 Responses
Last Response: Dec 08 2022 (11:03)
Rail Fanning
23986 views
20

★★★
Dec 07 2022 (23:53)  
Chaitanya~
Chaitanya~   483 blog posts
Entry# 5565659               Past Edits
3 compliments
Great Great Great
CRAZE FOR VANDE BHARAT EXPRESS

Back in 2015 or earlier in Railway Budget it was decided that Chhattisgarh will get its first semi-high speed train between Bilaspur and Nagpur and everyone thought just like New Delhi - Agra Cantt. Gatiman Express, there will be a Bilaspur Nagpur Gatiman Express.

But
...
more...
days passed, years passed no train was introduced between this route.

Then again a ray of hope ignited when PM of India said on Independence's Day that 75 Vande Bharat Express will be introduced on different routes and when the list came of proposed routes, there was the mentioning of Bilaspur - Nagpur Route.

And after few months of this news one of my cousin brother told me that his company has got tender for manufacturing some parts of these new 75 vande bharat express.

Then a shocking news came on 3rd December that on 11th December there will be inauguration of Bilaspur - Nagpur - Bilaspur Vande Bharat Express, there was a joy among SECR Railfans, our whatsapp group flooded with a lots of congratulating's messages, everyone was planning for the inauguration journey in the train.

3 Days later..

An update came that one rake of Vande Bharat Express dispatched from Integral Coach Factory (ICF) Chennai on 6th December and the same rake was spotted by someone at Balharshah Junction on 7th December and later on the same evening an update came in our whatsapp group that the rake departed Gondia Jn at 18:05hrs and then a fellow railfan from Durg spotted the rake at Durg Jn and updated in the group that train departed Durg Jn. at 21:38hrs. So I decided to capture the same rake at Saraswati Nagar Level Crossing as it was near to me. I took my bike and went to the Level Crossing and suddenly saw 12070 Gondia Raigarh Janshatabdi (running late by 4hrs), after that 12129 Pune Howrah Azad Hind Express (running late by 7hrs), 13288 Rajendra Nagar - Durg South Bihar Express (running late by 2hrs) and 18241 Durg Ambikapur Express. In between one of the group member told in the group that the rake of Vande Bharat Express might bypass the Raipur Jn. so it won't cross the Saraswati Nagar Level Crossing and suggested me to go Sarona, it was bit far so I just went near AIIMS Raipur over bridge and saw that some goods train was standing in the bypass (Mumbai - Howrah) downline so I was pretty much sure that the rake will cross Saraswati Nagar Level Crossing so again went back to the same place with fingers crossed. This time Level Crossing Gate closed, my heartbeat went up, that rake will come now but.... two goods train crossed simultaneously and I was disappointed that whether the rake of Vande Bharat Express crossed by the bypass line or not. Then I said this will be the last time, if it will not come I'll go home. The Level Crossing Gate closed, one boy asked to gateman that 2 trains will cross or just a single one ? The gateman replied there is a signal for 1 express train in Mumbai Howrah downline, suddenly I turned my mobile camera up and the train came and hurrayyyyy it was the rake of VANDE BHARAT EXPRESS (SECR's first and own) VANDE BHARAT EXPRESS !!!!!! Then the gateman told that boy, that it seems like the new train. I couldn't resist myself and replied to the gateman, that its the new VANDE BHARAT EXPRESS and he acknowledged me 😉

click here

Translate to English
Translate to Hindi

16095 views
1

Dec 08 2022 (10:09)
Surface_transport
Surface_transport   281 blog posts
Re# 5565659-1              
Many thanks for sharing video and great story full of suspense.
Now hope the train will be success.
Translate to English
Translate to Hindi

15122 views
0

Dec 08 2022 (11:03)
venkat_vskp~
venkat_vskp~   6448 blog posts
Re# 5565659-2              
but as per some reports AVG speed is just 75kmph, that too almost total route fit for 130 kmph.
At least 85 - 90 kmph avg speed required
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy