Search Forum
Blog Entry# 560538
Posted: Oct 23 2012 (22:46)
88 Responses
Last Response: Dec 07 2013 (21:33)
88 Responses
Last Response: Dec 07 2013 (21:33)
A COMPILATION OF RAIL SIGNS AND THEIR MEANINGS:
Compiled by me thanks to years of railfanning experience after reffering to many people and online material, I would quote an example with every sign to aid in understanding to the best extent possible:
The first thing we are concerned about when we are talking about movement of trains is anything which makes the train to de-accelerate, they can be in the following instances.
A...
more...
Compiled by me thanks to years of railfanning experience after reffering to many people and online material, I would quote an example with every sign to aid in understanding to the best extent possible:
The first thing we are concerned about when we are talking about movement of trains is anything which makes the train to de-accelerate, they can be in the following instances.
A...
more...
5 Public Posts - Tue Oct 23, 2012
31 Public Posts - Wed Oct 24, 2012
FINAL SIGNALLING NOTES:
AUTOMATIC BLOCK TERRITORY: Automatic Block territory is a very useful Block type used currently in most cities having a good rail Network. I am sceptical about its existence in Bangalore however it exists in all ways out of SC Jn. I automatic block the presence of a train in a block is detected by track circuitry or by using special track circuits and Axle counters in conjunction.
The major difference between this and absolute is that track length between two stations can be divided into multiple number of blocks irrespective...
more...
AUTOMATIC BLOCK TERRITORY: Automatic Block territory is a very useful Block type used currently in most cities having a good rail Network. I am sceptical about its existence in Bangalore however it exists in all ways out of SC Jn. I automatic block the presence of a train in a block is detected by track circuitry or by using special track circuits and Axle counters in conjunction.
The major difference between this and absolute is that track length between two stations can be divided into multiple number of blocks irrespective...
more...
17 Public Posts - Wed Oct 24, 2012
15 Public Posts - Thu Oct 25, 2012
2 Public Posts - Sat Oct 27, 2012
4 Public Posts - Thu Nov 01, 2012
5 Public Posts - Mon Apr 15, 2013
1 Public Posts - Wed Apr 17, 2013
2 Public Posts - Tue Apr 23, 2013
1 Public Posts - Thu Jun 27, 2013
3 Public Posts - Fri Dec 06, 2013
1 Public Posts - Sat Dec 07, 2013