Search Forum
Blog Entry# 932579
Posted: Dec 12 2013 (14:34)
11 Responses
Last Response: Dec 19 2013 (14:49)
11 Responses
Last Response: Dec 19 2013 (14:49)
Dec 12 2013 (14:34) 16331/Mumbai CSMT - Thiruvananthapuram Central Express (PT) guest 1172 blog posts
This train can be speeded up with slightly revised timings as follows:
TVC 0430, ERS 0830, CBE 1215, SA 1500, KJM 1900, YPR (NEW HALT) 1930 WITH DEP AT 2000, SUR 0800 NEXT DAY, PUNE 1200, CST 1600.
To this train, run a link train from Madurai to Salem (MDU dep 1030, Salem 1430 for merger) with 3 or 4 SL, 1 3A and 2 General and merge them at Salem.
On...
more...
TVC 0430, ERS 0830, CBE 1215, SA 1500, KJM 1900, YPR (NEW HALT) 1930 WITH DEP AT 2000, SUR 0800 NEXT DAY, PUNE 1200, CST 1600.
To this train, run a link train from Madurai to Salem (MDU dep 1030, Salem 1430 for merger) with 3 or 4 SL, 1 3A and 2 General and merge them at Salem.
On...
more...
6 Posts
YPR CST 20 hours is not possible as majority of this route is a single unelectrified route.
good thought... that route already have a link to mumbai thru 6339/40 thrice a week... it would more useful 6339/40 operate as link between TVC and SA and the other portion take the current route...
Nice. Anyway, we have 4 day slot to NCJ and 1 day to TVC. Combine all rakes & rearrange in such a way that on all 5 days, the train can run as NCJ/TVC to SA and combined at Salem to run upto CSTM. By using rakes of Balaji Exp (Via RU, CGL) also and make these arrangements as a daily one. For twice a week Balaji Express, time slot of LTT-KIK can be used between LTT-RU.
All these objectives can be met if this train is converted into a 24 coach train with speeding up. The timings suggested for entire stretch can be as follows:- CSTM 1100, PUNE 1500, SUR 1900, YPR 0700 next day, SA 1130, CBE 1430, ERS 1815,...
more...
All these objectives can be met if this train is converted into a 24 coach train with speeding up. The timings suggested for entire stretch can be as follows:- CSTM 1100, PUNE 1500, SUR 1900, YPR 0700 next day, SA 1130, CBE 1430, ERS 1815,...
more...
When Rajkot-CBE takes 20 hrs between KYN-KJM, why not for other trains? Pune to YPR KSK takes 15 hours only. From Pune to LTT it is only 3-1/2 hours.