Full Site Search  
Mon Aug 21, 2017 21:29:43 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by peekay
Page#    2 Blog Entries  
  
0 Followers
431 views
Mar 01 2010 (13:05)  
 

peekay   1 blog posts
Entry# 22302            Tags   Past Edits
india rail info is not real time data as compared to makemy trip

  
426 views
Mar 01 2010 (13:24)
moderator*^~   5589 blog posts   20 correct pred (57% accurate)
Re# 22302-1            Tags   Past Edits
Only the availability data on the Search page is not real-time - it is cached for the whole day, once someone gets the same. This is to keep the search pages as fast and responsive as possible (fetching avl data is a very slow process). The search page availability data is to give an overall big picture of what the availability is like. However, it is still as of the same day, not before.
All other data on this site is real time. Availability data on the individual train pages, pnr, running status, etc. are all real time. Please let us know any specific cases of other "cached" data. Thanks.
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Thu Mar 04, 2010 @ 07:55
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 15   |   Charting: < 21:00
Travel: BDTS/Bandra Terminus   to   UMB/Ambala Cantt. Junction   |   1574 km / 2029 km
12471/Swaraj Express (PT)
Entry# 22304
 

Posted by: peekay   1 blog posts
PNR: 823-xxxxxxx   |   Similar PNRs
Posted Status as of: Mar 01 2010 (13:07)
PNR: [[823-9763891]]
From: Mumbai Bandra Terminus/BDTS
To: Ambala Cantt. Junction/UMB
Date of Journey: Thu Mar 04
Class: AC 3-tier
Passenger 1: Waitlist# 7 (Booking Status: W/L 11,PQWL)
Chart NOT Prepared
it's still in the wait list. wait & watch till chart prepared

Latest Status as of: Mar 09 2010 (10:40) 
Passenger 1: B2,64 (Booking Status: W/L 11,PQWL)
Chart PREPARED
Page#    2 Blog Entries  

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.