Full Site Search  
Thu Aug 17, 2017 17:19:52 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by WAP4 at BSB
Page#    127 Blog Entries  next>>
  
Travel Question
0 Followers
1566 views
May 11 2016 (18:21)  
 

mushfiquekhalid^~   4344 blog posts   2546 correct pred (73% accurate)
Entry# 1841881            Tags   Past Edits
Need help from u all, i want to book 2 tickets from HWH to BE after 21/05/2016 but before 28/05/2016. But i could not able to get ticket in any train as all the trains gone upto minimum WL50. Can any one tell in which train should i book ticked so that the chances of getting confirm is more?
Train with least travelling time is preferred.

6 posts are hidden.

  
May 11 2016 (18:58)
WAP4 at BSB   131 blog posts   37 correct pred (70% accurate)
Re# 1841881-7            Tags   Past Edits
Go for 12987 SDAH to MGS available throughout
Take an auto to BSB
Book in 14257 BSB to BE Confirm seats available.

  
1181 views
May 11 2016 (19:00)
Guest: 3b0f2f05   show all posts
Re# 1841881-8            Tags   Past Edits
Thanks for spending ..your valuable time for us ..
:-)
  
★★  General Travel
0 Followers
8326 views
Jun 22 2014 (08:23)   13257/Danapur - Anand Vihar Terminal Jan Sadharan Express (UnReserved) | LKO/Lucknow Charbagh NR (9 PFs)
 

اطل مشرا   753 blog posts   1045 correct pred (75% accurate)
Entry# 1142975            Tags   Past Edits
12387/88 RPJB-ANVT Jansadharan to be routed through Varanasi, Lucknow, Moradabad.

11 posts are hidden.

  
2117 views
Jun 22 2014 (18:13)
WAP4 at BSB   131 blog posts   37 correct pred (70% accurate)
Re# 1142975-12            Tags   Past Edits
BSB is no more skipped by durgiana express as well :)

1 posts are hidden.

  
2101 views
Jun 24 2014 (20:52)
Prakhar*^~   4307 blog posts   414 correct pred (81% accurate)
Re# 1142975-14            Tags   Past Edits
Dats gud. But dis train sud run non stop except bihar s usual.

8 posts are hidden.
  
General Travel
0 Followers
3421 views
Jun 22 2014 (17:34)  
 

venky 63~   829 blog posts   65 correct pred (59% accurate)
Entry# 1143549            Tags   Past Edits
going on circular tkt from mas to sspn ,ltt , indore0-ujjain - delhi - haridwar - bsb - howrah - vizag - bezawada- mas on aug ist in ac 3 tier , all tkt confirmed except sspn - lttt by 11014 which is wl 5 , hopefully it should confirm as train has 4 a c 3 coaches

4 posts are hidden.

  
1945 views
Jun 22 2014 (17:53)
WAP4 at BSB   131 blog posts   37 correct pred (70% accurate)
Re# 1143549-5            Tags   Past Edits
Add to it...Maanas Mandir!!! :)

2 posts are hidden.

  
1899 views
Jun 22 2014 (17:55)
यन्त्रविन्यासYantravinyas   19814 blog posts   427 correct pred (89% accurate)
Re# 1143549-8            Tags   Past Edits
done added

  
1989 views
Jun 22 2014 (17:55)
Soumitra Chawathe*^~   30230 blog posts   98246 correct pred (72% accurate)
Re# 1143549-9            Tags   Past Edits
Uske baaju wala Tridev Mandir + saamne wala Durga Mandir + Kavdi Mata + Kachori Galli

7 posts are hidden.
  
★★★  Rail Budget
1 Followers
10511 views
Jun 22 2014 (10:35)   LJN/Lucknow Junction NER (6 PFs)
 

Twesh Rajput~   5500 blog posts   5034 correct pred (86% accurate)
Entry# 1143083            Tags   Past Edits
Now its time write your suggestions to railway board for final railway bugdet 2014-15..official release in hindustan newspaper...MAIL your suggestions through your email id to railbudget2014@rb.railnet.gov.in

13 posts are hidden.

  
2346 views
Jun 22 2014 (16:54)
WAP4 at BSB   131 blog posts   37 correct pred (70% accurate)
Re# 1143083-15            Tags   Past Edits
I've tried to do my bit...Let's see how much of this is implemented...Comments welcome...a copy of my email sent to the railway board
************************************************** ************Dear Sir,
Let me first congratulate you on this immaculate effor of asking the common public for their suggestions on the upcoming railway budget. Being a resident of Varanasi, I would like to present a few points which as per my understanding, could be important in the development of Varanasi as a city and its suburbs.
a)
...
more...
Introduction of a Jan Sadharan superfast express between Varanasi and BDTS(Mumbai Bandra) covering Surat and Vadodara for our worker class people who work in Gujrat and Mumbai.
b) Introduction of a superfast special between Varanasi and Agra via Lucknow/Kanpur - Looking at the high number of tourists who visit both Agra and Varanasi.
c) Introduction of an overnight superfast express train between Varanasi and Howrah via Gaya (12333/12334 Vibhuti express initially ran between these two cities but was later extended to Allahabad city for God knows, what reason. BSB now comes under RLWL and makes it quite difficult for local people to get confirmed tickets to howrah, also the connection is not quite as fast as it could be like some other trains which run through mughalsarai and gaya)
d) Introduction of Weekly Superfast train between Bangalore and Varanasi - It is quite a surprise to see that these two major cities of India are not connected to each other through Rail. Varanasi, being an education hub (with BHU and 3 other universities) and Bangalore being an IT/Employment hub, it becomes quite imperative to provide a fast rail connection to these cities.
e) Provide manual ticket vending machines at major stations, to remove the large queues and touts operating. This could even be integrated with the ATMs of major banks to directly debit the money from debit/credit cards and issue the tickets.
f) Provide escalators/lifts at major stations to help facilitate smoother movement of senior citizens/differently abled persons across platforms. I live in the UK and the smallest of railway stations here has these facilities, wonder why we can not provide these at least on our major stations in India. I know a few of my friends and relatives who due to these challenges are never able to board a train.
g) Provide better sanitation/hygiene facilities on stations/trains. When at station/platforms, wonder how many of us would have preferred using a toilet there unless of an absolute emergency. Hope this is given a major emphasis on, in this railway budget, and is implemented in the near future.
h) Provide better safety measures in the trains. Deploy more security forces, install cctv cameras in coaches to help make rail journeys a better and safe one.
Hoping to see some change in our railway framework with the upcoming budget
Thanks
************************************************** ************

45 posts are hidden.
  
Info Update
0 Followers
2523 views
May 09 2014 (00:44)  
 

WAP4 at BSB   131 blog posts   37 correct pred (70% accurate)
Entry# 1089722            Tags   Past Edits
मुरादाबाद, जासं : अगले महीने से हरिद्वार तक इलेक्टिक इंजन से ट्रेनें दौड़ने लगेंगी। इलेक्टिफिकेशन में बाधा बने हरिद्वार स्टेशन के फुटओवर ब्रिज का काम पूरा हो गया है। हरिद्वार से हावड़ा तक जाने वाली ट्रेन कुंभ एक्सप्रेस को अब मुरादाबाद में इंजन नहीं बदलना होगा। यह ट्रेन अगले महीने से हरिद्वार से सीधे इलेक्टिक इंजन से हावड़ा तक जाएगी। 1 एडीआरएम हितेंद्र मल्होत्र ने बताया कि हरिद्वार स्टेशन पर मौजूद कम ऊंचाई का फुटओवर ब्रिज इलेक्टिफिकेशन कार्य में बाधक था। इस फुटओवर ब्रिज को हटाकर वहां पर्याप्त ऊंचाई वाले ब्रिज का निर्माण करा दिया गया है। लक्सर से हरिद्वार तक ट्रैक इलेक्टिफिकेशन का कुछ कार्य ही शेष बचा है, जिसे अगले महीने तक पूरा करा लिया जाएगा। इसके साथ ही मुरादाबाद से हरिद्वार तक बिना रुकावट के इलेक्टिक टेनों का संचालन शुरू हो जाएगा।1 मुरादाबाद से दिल्ली के लिए अगले साल इलेक्टिक ट्रेनों का संचालन शुरू हो जाएगा। एडीआरएम ने...
more...
बताया कि अगले वर्ष मार्च में रेलवे ट्रैक इलेक्टिफिकेशन कार्य पूरा होने का लक्ष्य रखा गया है। इस ट्रैक पर तेजी से काम चल रहा है। दिल्ली तक इलेक्टिक ट्रैक पूरा होते ही अधिकांश ट्रेनों का संचालन इलेक्टिक इंजन से शुरू हो जाएगा।6अगले महीने पूरा हो जाएगा इलेक्टिफिकेशन का कार्य

  
2304 views
May 09 2014 (02:55)
ashalanshu   658 blog posts   1 correct pred (100% accurate)
Re# 1089722-1            Tags   Past Edits
Thanks for the update dear. What's the ground report of MB-GZB electrification?

1 posts are hidden.
Page#    127 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.