Full Site Search  
Fri Aug 18, 2017 12:19:04 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by Increase SL fare Reduce AC fare
Page#    221 Blog Entries  next>>
  
Predictions: 6
confirm: 6
rac: 0
wl: 0
Journey: Tue Aug 08, 2017 @ 12:00
Class: Sleeper - SL
Travel: ANG/Ahmadnagar   to   JP/Jaipur Junction
12627/Karnataka Express (PT)
Entry# 2373541

PNR: 413-xxxxxxx   |   Similar PNRs
Posted Status as of: Aug 07 2017 (14:20)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: RLWL# 71 (GN) (Booking Status: RLWL# 118)
Passenger 2: RLWL# 72 (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 73 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Aug 07 2017 (21:23)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/NC (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/NC (GN) (Booking Status: RLWL# 119)
Passenger 3: Confirmed: S6/52 [LB]/LB (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart PREPARED
Train Number: 12627 (TT of this Train needs to be fixed)

Full PNR Status History (5 statuses)
Status as of: Aug 07 2017 (21:23)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/NC (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/NC (GN) (Booking Status: RLWL# 119)
Passenger 3: Confirmed: S6/52 [LB]/LB (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart PREPARED
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 07 2017 (19:34)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/LB (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/SU (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 67 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 07 2017 (15:19)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: Confirmed: S10/41 [LB]/LB (GN) (Booking Status: RLWL# 118)
Passenger 2: Confirmed: S12/40 [SU]/SU (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 73 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 07 2017 (14:18)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: RLWL# 71 (GN) (Booking Status: RLWL# 118)
Passenger 2: RLWL# 72 (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 73 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)

Status as of: Aug 06 2017 (17:58)
Resv From: ANG/Ahmadnagar
Boarding Point: ANG/Ahmadnagar
Resv To: MTJ/Mathura Junction
Resv Quota: GN

Passenger 1: RLWL# 81 (GN) (Booking Status: RLWL# 118)
Passenger 2: RLWL# 82 (GN) (Booking Status: RLWL# 119)
Passenger 3: RLWL# 83 (GN) (Booking Status: RLWL# 120)
Total Fare:  2025
Chart NOT Prepared
Train Number: 12627 (TT of this Train needs to be fixed)


1 posts are hidden.

  
389 views
Aug 13 2017 (02:03)
Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Re# 2373541-2            Tags   Past Edits
Yes.. At PRS counter, you can take blank paper tickets

  
71 views
Yesterday (10:29)
rshbaggarwal283   516 blog posts   167 correct pred (58% accurate)
Re# 2373541-3            Tags   Past Edits
Okay Thanks. I guess for AC class we cannot take, but we can only take for SL class.
  
General Travel
0 Followers
417 views
Aug 14 2017 (23:13)   RE/Rewari Junction (8 PFs)

Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Entry# 2380506            Tags   Past Edits
DELHI-REWARI section will be electrified in just 9 MONTHS.. Means in June, 2018 Delhi-Alwar section or Delhi-Mathura via Alwar will be fully elctric

  
249 views
Aug 15 2017 (20:42)
Aditya*^~   4563 blog posts   2416 correct pred (69% accurate)
Re# 2380506-1            Tags   Past Edits
I think in this press release, IR is referring Gurgaon as "Gurugram". which is a mistake. haryana government has changed city name. Station name is still Gurgaon

  
187 views
Aug 16 2017 (01:38)
Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Re# 2380506-2            Tags   Past Edits
Yes

2 posts are hidden.
  
General Travel
0 Followers
431 views
Aug 14 2017 (23:22)   DEE/Delhi Sarai Rohilla (5 PFs)

Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Entry# 2380515            Tags   Past Edits
Details of Delhi Sarai Rohilla to Rewari electrification

  
236 views
Aug 15 2017 (12:47)
★★★BRC WAP 7😎~   1366 blog posts   1887 correct pred (90% accurate)
Re# 2380515-1            Tags   Past Edits
sp ssp tss... please explain me

  
240 views
Aug 15 2017 (16:09)
Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Re# 2380515-2            Tags   Past Edits
#ELECTRIFICATION DETAILS:------>
Sectioning and Paralleling Post (SP)
These posts are situated approximately midway between feeding posts marking the demarcating point of two zones fed from different phases from adjacent sub-stations. At these posts, a neutral section is provided to make it impossible for the pantograph of an electric locomotive or EMU train to bridge the different phases of 25 kV supply, while passing from the zone fed from one sub-station to the next one. Since the neutral section remains 'dead', warning boards are provided in advance to warn and remind the Driver
...
more...
of an approaching electric locomotive/EMU to open locomotive circuit breaker (DJ) before approaching the 'neutral section', to coast through it and then switch 'on' on the other side. Special care is taken in fixing the location of neutral sections, on level tangent tracks far away from signals, level crossing gates etc. to ensure that the train coasts through the neutral section at a sufficiently high speed, to obviate the possibility of its stopping and getting stuck within the neutral section.
A paralleling interruptor is provided at each 'SP' to parallel the OHE of the up and down tracks of a double track section, 'bridging interrupters' are also provided to permit one feeding post to feed beyond the sectioning post upto the next FP if its 25 kV supply is interrupted for some reasons. These bridging interruptors are normally kept open and should only be closed after taking special precautions as detailed in these rules.
Sub-Sectioning and Paralleling Post (SSP)
One or more SSPs are provided between each FP and adjacent SP depending upon the distance between them. In a double track section, normally three interruptors are provided at each SSP i.e. two connecting the adjacent sub-sectors of up and down tracks and one for paralleling the up and down tracks.
Source:
click here
  
General Travel
0 Followers
651 views
Aug 02 2017 (00:31)   SWD/Sanawad (1 PFs)

Railway privatisation is must^~   84393 blog posts   5303 correct pred (78% accurate)
Entry# 2368420            Tags   Past Edits
As per news sources Mhow Sanawad #MegaBlock from October
#GC

3 posts are hidden.

  
458 views
Aug 03 2017 (22:03)
Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Re# 2368420-5            Tags   Past Edits
What is about Sanawad to Khandwa line??

  
440 views
Aug 03 2017 (23:30)
Railway privatisation is must^~   84393 blog posts   5303 correct pred (78% accurate)
Re# 2368420-6            Tags   Past Edits
Already in Mega Block.
  
Jul 29 2017 (20:59)   MTJ/Mathura Junction (10 PFs)

Increase SL fare Reduce AC fare   426 blog posts   61 correct pred (70% accurate)
Entry# 2365953            Tags   Past Edits
Alwar-Mathura section speed 120KMPH
Page#    221 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.