Full Site Search  
Fri Aug 18, 2017 18:20:24 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by swaroophegde5~
Page#    295 Blog Entries  next>>
  
General Travel
1 Followers
9935 views
May 26 2017 (15:38)   S/Shrirangapattana (1 PFs)

Prometh Suresh~   492 blog posts   648 correct pred (66% accurate)
Entry# 2294022            Tags   Past Edits
When will doubling work at Shrirangapattana and electrification work b/w Yeliyur and Mysore be completed?

40 posts - May 2017

22 posts - Jun 2017

45 posts - Jul 2017

9 posts - Wed Aug 02, 2017

2 posts - Fri Aug 11, 2017

3 posts are hidden.

  
240 views
Aug 11 2017 (20:48)
Prometh Suresh~   492 blog posts   648 correct pred (66% accurate)
Re# 2294022-125            Tags   Past Edits
Sir electrification progress?

1 posts are hidden.

  
202 views
Aug 12 2017 (12:47)
fayazdm   141 blog posts
Re# 2294022-127            Tags   Past Edits
Painting and barricade works finished at station bro in shrirangapattana?

  
249 views
Aug 12 2017 (15:41)
swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Re# 2294022-128            Tags   Past Edits
Electrification process over BDRL, SRIRANGAPATNA BRIDGES and in MYS JN. going on in full swing

  
275 views
Aug 12 2017 (15:42)
swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Re# 2294022-129            Tags   Past Edits
Painting works over. Barricading not yet completed

1 posts are hidden.

  
303 views
Aug 12 2017 (17:17)
Fayaz Dm   4 blog posts
Re# 2294022-131            Tags   Past Edits
Ok

18 posts are hidden.
  
Rail News
0 Followers
395 views
New Facilities/TechnologySWR/South Western  -  
Aug 08 2017 (23:19)   Come November, Trains To Mysuru To Run On Electricity

swaroophegde5~   3 news posts
Entry# 2374780   News Entry# 311136         Tags   Past Edits
Bengaluru: After a five-year delay in the doubling of the Mysuru-Bengaluru track, the South Western Railway is working overtime to electrify the track between Yeliyur (near Mandya) and Mysuru. Once the electrification is complete, the double track will be open after an inspection by the Commissioner for Railway Safety. Trains are likely to ply on the electrified double track from Nov. 2017.
Railway authorities who are undertaking the double tracking works got a shot in the arm after the 223-year-old armoury built by Tipu Sultan was shifted clearing the way for the 1.5 km double tracking works. After shifting the armoury at a cost of Rs. 13.6 crore, work is on to finish the doubling project.
...
more...

The track doubling works should have been completed at least five years ago. The project that began in 2003 was completed in phases with the 11-km Ramanagaram-Channapattana stretch becoming operational in 2010, followed by Mysuru-Naganahalli section next year and Channapatna-Shettihalli stretch a year later. The last stretch to be commissioned was Pandavapura-Naganahalli as Tipu’s armoury continued to delay the second track at Srirangapatna.
According to Railway authorities, most of the civil work has been completed and the double track is expected to be commissioned by Nov. this year. On the electrification, works between Yeliyur and Mysuru is almost complete and works in the Mysuru yard and the new bridge across River Cauvery in Srirangapatna was in progress.
As part of doubling, a total of 11 level-crossing gates (3 unmanned and 8 manned) have been eliminated with construction of road over/under bridges, which will play a major role in eliminating accidents on tracks.
The electrification of the Bengaluru-Mysuru track will reduce the time required to change locomotives at Krantivira Sangolli Rayanna (KSR) city Railway Station in Bengaluru. Two daily and four weekly trains to Mysuru which arrive with electric locomotives have to be stopped for about 15 minutes at KSR to attach a diesel locomotive. Electrification of tracks will save this time and effort. The track doubling, however, will not cut the travel time. The maximum difference may be about five minutes

  
1050 views
Aug 09 2017 (01:44)
Akhlaq~   357 blog posts
Re# 2374780-1            Tags   Past Edits
Gr8 news

  
879 views
Aug 09 2017 (07:05)
srinivasvasanthi~   4019 blog posts   13 correct pred (50% accurate)
Re# 2374780-2            Tags   Past Edits
Since change of Diesel engine times are saved in Bangalore City.The City junction may be handled further ( 15% )more expresses .That's are very useful to the passenger.

  
794 views
Aug 09 2017 (09:04)
★★★BRC WAP 7😎~   1366 blog posts   1887 correct pred (90% accurate)
Re# 2374780-3            Tags   Past Edits
Dont mention KSR city station in Bangalore. Its not an suburban station that its mentioned like this here.
Directly u may explain at Bangalore City Junction.
  
★  General Travel
0 Followers
874 views
Aug 06 2017 (13:55)   MYS/Mysuru Junction (Mysore) (6 PFs)

swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Entry# 2372665            Tags   Past Edits
Round the clock electrification train taking some rest after it's duty in Mysore Jn.

4 posts - Tue Aug 08, 2017

  
415 views
Aug 08 2017 (14:50)
fayazdm   141 blog posts
Re# 2372665-5            Tags   Past Edits
So now in electrification part only srirangapattana ,byadarahalli , palahalli and Mysore junction to be done right?

  
366 views
Aug 08 2017 (15:33)
swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Re# 2372665-6            Tags   Past Edits
Yes and also substation at yeliyur

  
380 views
Aug 08 2017 (15:56)
Goundamani   212 blog posts
Re# 2372665-7            Tags   Past Edits
Nice pics!!! Could you please let me know why the name is "Round the clock"? Is it significantly different from other electrification trains?

  
352 views
Aug 08 2017 (15:58)
Goundamani   212 blog posts
Re# 2372665-8            Tags   Past Edits
Also in pic 1, which is that green livery train behind the inspection car?

  
317 views
Aug 08 2017 (17:54)
swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Re# 2372665-9            Tags   Past Edits
The green livery train is 16215/6 chamundi express.
  
★  General Travel
0 Followers
721 views
Aug 05 2017 (07:36)   17302/Dharwad Mysuru Express | MYS/Mysuru Junction (Mysore) (6 PFs) | UBL/WDG-4/12086

swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Entry# 2371399            Tags   Past Edits
UBL WDG4 12086 maroon and yellow livery in Mysore Jn came with 17302 DWR MYS EXP

  
588 views
Aug 06 2017 (07:54)
Waiting for UBL MAQ exp~   2256 blog posts   739 correct pred (70% accurate)
Re# 2371399-2            Tags   Past Edits
Why have they painted it in these colours ??

  
532 views
Aug 06 2017 (10:50)
swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Re# 2371399-3            Tags   Past Edits
I donno. This is fist ubl loco in which I'm seeing this. Looks like the livery of our futuristic loco jointly done with GE,USA
  
General Travel
0 Followers
764 views
Jul 11 2017 (17:05)  

MJ*^   8782 blog posts   11662 correct pred (68% accurate)
Entry# 2349515            Tags   Past Edits
Under "Mission Raftaar"-
Following passenger/exp have been upgraded (and/or extended) to exp/SF and speeded up
1-56213/14 chamrajnagar-tirupati pass to 16219/20 exp
2-17430/29 rayalaseema exp to nizamabad and renumbered as 12793/94
3-57620/19 kacheguda to repalle pass
...
more...
to exp 17626/25 exp
4-16201/16202, KSR Bengaluru - Shivamogga - KSR BengaluruDaily Express into Daily Superfast Express with change in Train No.as 20651/20652.
5-56234/56233 sbc-mys passenger converted to Mysuru-Talaguppa Express train number 16227/28 .
6-16577/78 harihar-ypr exp speeded up by 10mns subjected to more updates

3 posts are hidden.

  
467 views
Jul 16 2017 (08:32)
swaroophegde5~   488 blog posts   95 correct pred (67% accurate)
Re# 2349515-4            Tags   Past Edits
1 compliments
Thank now corrected
Sir 56213/4 MYS TPTY is converted to exp. True that. But speed isn't increases right?

  
308 views
Jul 20 2017 (18:15)
MJ*^   8782 blog posts   11662 correct pred (68% accurate)
Re# 2349515-5            Tags   Past Edits
16577/78 harihar-ypr exp speeded up by 10mns subjected to more updates
Page#    295 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.