Full Site Search  
Wed Aug 23, 2017 07:53:04 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Filters:
Blog Posts by riz339~
Page#    1734 Blog Entries  next>>

2 posts are hidden.

  
33 views
Yesterday (21:41)
riz339~   2700 blog posts   113 correct pred (58% accurate)
Re# 2387850-3            Tags   Past Edits
It should be introduced bet adi but first

  
34 views
Yesterday (21:43)
★★★BRC WAP 7😎 with BCT RAJDHANI~   1501 blog posts   1954 correct pred (90% accurate)
Re# 2387850-4            Tags   Past Edits
agar mumbai ahmedabad ma introduce kiya hota toh baat hi kuch aur hoti ti.
but for introduction in bct adi than WR will have to cancel ADI DD EXP.
so that pass can come in tejas

7 posts are hidden.
  
Poll
0 Followers
88 views
5 votes
Yesterday (19:27)  

♥ Bareilly Ki Barfi ♥~   3375 blog posts   77 correct pred (64% accurate)
Entry# 2387699            Tags   Past Edits
Should bullet train be introduced on Mumbai Ahmedabad route? If no,provide a solid reason.
Yes80%4
No. (Legitimate reason required).20%1

1 posts are hidden.

  
85 views
Yesterday (19:34)
riz339~   2700 blog posts   113 correct pred (58% accurate)
Re# 2387699-3            Tags   Past Edits
Better to invest those resources into existsing infra go mordanisation n safety, maintainance, track, signal etc
  
General Travel
0 Followers
91 views
Yesterday (11:47)   ARA/Ara Junction (3 PFs)

riz339~   2700 blog posts   113 correct pred (58% accurate)
Entry# 2387245            Tags   Past Edits
Two new DEMU services to be started between ARA Sasaram stations in ECR. Inaugural train to be flagged off today at 330 PM from ARA station
Source-Twitter
  
Poll
0 Followers
218 views
13 votes
Aug 21 2017 (17:18)  

Aman~   265 blog posts   13 correct pred (76% accurate)
Entry# 2386642            Tags   Past Edits
Should Dli-Re passenger trains be extended? If yes, then upto which station.
KRH/Khairthal0%0
AWR/Alwar38%5
BKI/Bandikui8%1
JP/Jaipur8%1
No. Not needed46%6

  
164 views
Aug 21 2017 (18:52)
riz339~   2700 blog posts   113 correct pred (58% accurate)
Re# 2386642-2            Tags   Past Edits
Upto ajmer via ringus

2 posts are hidden.

  
167 views
Aug 21 2017 (19:08)
Aman~   265 blog posts   13 correct pred (76% accurate)
Re# 2386642-5            Tags   Past Edits
upto aii will be too long.
  
Poll
0 Followers
529 views
27 votes
Aug 20 2017 (12:50)  

♥ Bareilly Ki Barfi ♥~   3375 blog posts   77 correct pred (64% accurate)
Entry# 2385519            Tags   Past Edits
Which of these projects is the most important one in Gujarat and should be completed on war footing?
Surendranagar Rajkot Doubling with Electrification and Ahmedabad Surendranagar Electrification4%1
Udhna Jalgaon Doubling with Electrification19%5
Ahmedabad Mahesana Gauge Conversion with Electrification4%1
Mahesana Palanpur Electrification15%4
Mahesana Palanpur Doubling19%5
All remaining Gauge Conversion Projects37%10
Rajkot Okha Doubling4%1
Vatva Ahmedabad 3rd line and Sabarmati Ahmedabad Vatva 4th Line0%0

  
450 views
Aug 20 2017 (14:58)
riz339~   2700 blog posts   113 correct pred (58% accurate)
Re# 2385519-1            Tags   Past Edits
Mahesana palanpur n rajkot okha #doubling still not sectioned
Better that all #gc must be completed fast
Patan bhildi #NL
Chhotaudepur alirajpur #NL
dahod katwara n tihi sahour Ofdahod Indore
...
more...
#NL. Must complete this year
#gc
Ahmedabad himatnagar raigad
Mahesana vadnagar
Bhuj deshalpur should complete this year
Somnath kodinar, Modasa shamlaji #NL r under land acquisition stage
Bhimnath dholera n Tarnga abu #NL under dpr stage
Ahmedabad botad n jetalsar dhasa #gc mega block will declare end of yr
Udn jl# doubling should complete dis yr
Ahmedabad Palanpur #electrification should complete dis yr
Ahmedabad rajkot n mahesana samakhiyali #electrification in pogress

3 posts are hidden.

  
247 views
Aug 21 2017 (19:04)
riz339~   2700 blog posts   113 correct pred (58% accurate)
Re# 2385519-5            Tags   Past Edits
Palanpur mahesana n rajkot okha #doubling should section next yr
Following #electrification should section next yr
Palanpur samakhiyali,
rajkot somnath,
porbandar kanlus,
...
more...
wansjaliya jetalsar,
surendranagar mahuva,
Bhavnagar dhola
Ahmedabad udaipur
Nasiad modasa shamlaji
Patan mahesana
All remaining #gc should sectioned
#NL requires
Tarapur bhavnagar Porbandar okha
Daman nasik
Modasa dahod
Piplod rajpipla
Gandhinagar prantij
Ambaji khedbhrma
Saradiya porbandar
Botad jasdan
New terminal required
Kanknariya in Ahmedabad
Vishvamitri n chhayapuri in Vadodara
Udhna in Surat
Mega block should taken aspa for #gc work
Ahmedabad botad
Jetalsar dhasa
Ahmedabad kalol
Miyagam dabhoi
Page#    1734 Blog Entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.