Search Forum
Filters:
Page# 419184 Blog Entries next>>
04051/04052 नई दिल्ली-दरभंगा बिहार संपर्क क्रांति क्लोन एक्सप्रेस। इस गाड़ी का संचालन हर रोज अलग अलग ट्रेन नं:- से जनरल कोच के साथ हो रहा है।
What's the status of EDFC ? Is it fully completed or some patches are still left ?
Completed.
Son Nagar to Dankuni Stretch EDFC was cancelled DFCCIL.
Son Nagar to Dankuni Stretch EDFC was cancelled DFCCIL.
So the construction between Sonnagar and Dankuni cancelled? I've read somewhere that it's being constructed in a PPP model
Apr 21 (14:42) 04217/Varanasi - Lucknow MEMU Express Special | AY/Ayodhya Dham Junction (3 PFs)
harshityadav~
harshityadav~ 1269 blog postsSo that was it for this train. No more departures now.
Originally scheduled to run till 20th April as a special TOD., NR LKO did not care to extend it's run.
Maybe they used this train as some sort of trial to introduce a new vande metro / Intercity. But in any case runtime of 5hr20m was way to less. Because this train...
more...
Originally scheduled to run till 20th April as a special TOD., NR LKO did not care to extend it's run.
Maybe they used this train as some sort of trial to introduce a new vande metro / Intercity. But in any case runtime of 5hr20m was way to less. Because this train...
more...
Just received an info that dates of this train would be extended.
Today (14:36) 07231/Secunderabad - Arsikere Special Fare Summer Special | SMET/Shivamogga Town (Shimoga) (3 PFs)
krnt_vskp_express~
krnt_vskp_express~ 5691 blog postsAriskere to Shimoga is another 135km requires 2.5hrs one way and 5 hrs for round trip. So not possible even with speedup. If train skips YPR there will be no occupancy in Benguluru Shimoga section and weekly spl traveller won't prefer to travel even if its regular as there are more convenient scheduled intercity express trains.
Page# 419184 Blog Entries next>>