Search Forum
Filters:
Page# 674364 Blog Entries next>>
Trip Started: Wed Apr 24 by DreamTrip22503^~
0 | updating ... |
On Trip going to Mahakaal Darshan
31 Posts
@PUD: Phanda 0km/h 24m late
@PUD: Phanda &0 km/h #09190: Katihar - Mumbai Ctrl Special Fare Summer Special overtaken #09200: Bhopal - Ujjain Express Special here same train was earlier overtaken by our train at Sant hirdaram nagar station outer
Yesterday (12:16) 16779/Tirupati - Rameswaram Express (PT) | DG/Dindigul Junction (5 PFs) | RPM/WAP-7/30333
sivaprakashofficial^~
sivaprakashofficial^~ 5946 blog postsThis train literally needs to be made as a daily train ASAP. In fact, it was a daily train in MG period.
It enjoys good patronage throughout the years, even though the TT is very slow. With Extra summer rush, several ICF rakes in hand and 90% of the route is having 110 MPS, SR is waiting for what? Literally losing good amount of revenue.
It enjoys good patronage throughout the years, even though the TT is very slow. With Extra summer rush, several ICF rakes in hand and 90% of the route is having 110 MPS, SR is waiting for what? Literally losing good amount of revenue.
1 Posts
In the MG era it was a Daily train. It should be made a Daily. It should be speeded up as much as possible.
1 Posts
10 Posts
I feel Katihar CDO shud be used and new train for ANVT, ASR should be explored via PRNA FBG Saraigarh Nirmali DBG NKE GKP CNB.
This route should also get a Delhi bound train & KIR CDO shud be used for maintenance.
KIR has 4 pitlines but only a small number of trains for primary maintenance..
This route should also get a Delhi bound train & KIR CDO shud be used for maintenance.
KIR has 4 pitlines but only a small number of trains for primary maintenance..
Yes 3rd ac now a days, I don't expect much more as gone are those days when even on standing platforms window glasses were cleaned, but respective cdo should atleast take care of basics like washroom tap workings handwashes etc. My adjacent coach is A3 and washroom was equally pathetic maintenance wise. This train had a good image in my mind earlier but this time points would be down.quite possible whole rake needs an overhaul.
Mahananda has become a good train now few months back I travelled from pryj to dli. Coach condition was good but too many unauthorised passengers after kanpur and enroute stations was a major problem in that train. Amrapali is way better in everything but timings and schedule is bad.
A new bypass line is in progress at lalitgram. Could not take pictures but I saw. And rigorous work in progress for dbg bypass. After that few trains should originate from katihar via purnea fbg. That will develope the most neglected region in effective way. That route is awesome but needs to be straightened.
NJP CDO only takes cares of WB trains in fact the special trains of WB too😂😂😂This trains get usually delay between GKP-NDLS section which makes its non prefable train for NFR paseengers so they choose MAHANANDA above this
Trip Started: Tue Apr 23 by PrateekWRMumbai
0 | updating ... |
Back To Mumbai Trip in speedy train
7 Posts
Today (06:36) 04499/Delhi - Rewari DEMU Express Special | RE/Rewari Junction (8 PFs)
SSSharma_ji
SSSharma_ji 157 blog postsPage# 674364 Blog Entries next>>