Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Purulia Express: লালপাহাড়ীর দ‍্যাশে যাবি? চিন্তা কিসের লো? বিকাল বেলা হাওড়া থেকে পুরুল্যা এক্সপেরেস পাবি। - Dip

Search Trains
Post PNR
What is Tare and POH??  
7 Answers
Jul 28 2011 (00:11)
Coach Construction/Seating Arrangements

Entry# 53     
KishorWhoAJE2here~
What is Tare and POH??

110174 views
0
Aug 05 2011 (14:34)
Blog Post# 215476-1     
Jayashree^   Added by: guest  Aug 05 2011 (14:41)
The word tare is defined as the 'weight' of the packaging material or container which is used to pack something.
It is the weight of the empty reel, spool or container.
The word tare is also the weight of a railway car when it is not loaded.
source:Internet

113194 views
0
Apr 28 2011 (12:28)
Blog Post# 148326-1     
Alok   Added by: moderator^~  Jul 28 2011 (04:44)
In regards to coaches, Tare means weight of empty but fully constructed coach. (no passengers/luggage inside)

116172 views
0
Apr 28 2011 (12:30)
Blog Post# 148326-2     
kyakarun   Added by: moderator^~  Jul 27 2011 (07:02)
ohh thnx!! mns here its 39.2 tonnes. wat about POH?

★  
114998 views
7
Apr 28 2011 (12:44)
Blog Post# 148326-3     
Jayashree^   Added by: moderator^~  Jul 27 2011 (07:02)
@kya_karun: Re# 148326-0
POH

Each coach which carries passengers on Indian Railways undergoes what is termed as Periodic Overhaul (POH) every 12 months. You can find at the back of each coach the date markings of the date when POH was done, and the scheduled date of return for the next overhaul.
Technically,
...
more...
this should be 12 months. But a lot of coaches are actually marked for 18 months. Some are marked 12, but it is common to find coaches which have exceeded that. This means that instead of every 12 months, a coach undergoes overhaul every 15-18 months.
In a POH, the broken parts are repaired, light bulbs/tubes replaced, torn seats replaced, suspension overhauled, batteries replaced, wiring repaired if needed, additional charging plug points provided and the coach is repainted.

112584 views
0
Apr 28 2011 (13:01)
Blog Post# 148326-4     
Guest: 86fd14a7   Added by: moderator^~  Jul 27 2011 (07:02)
thanks for giving info in so much detail
akg

113629 views
0
Apr 28 2011 (13:07)
Blog Post# 148326-5     
Jayashree^   Added by: moderator^~  Jul 27 2011 (07:02)
good name pls.
why only akg?

109042 views
0
Apr 28 2011 (14:07)
Blog Post# 148326-6     
Abhishek Chanda   Added by: moderator^~  Jul 27 2011 (07:02)
In addition to coaches, Locomotives too undergo POH, IOH. Intermediate Over haul.
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy