Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Tamil Nadu Express - எங்கள் உயிர் துடிப்பு - Vijay Baradwaj

Search PNRs
Post PNR

PNR: 873-xxxxxxx

PNR Forum Entry# 1301437
PREDICTIONS: confirm:0  rac:0  waitlist:4 
Journey: Mon Dec 15, 2014
Departure: NK/Nashik Road @ 11:05 PF#: 2
Arrival: HW/Haridwar @ 12:25 +1 night PF#: 6,7
Distance: 1602 km / 1769 km
Travel Time: 25h 20m  9 halts
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0048#   |   Charting: < 21:00

Latest Status as of: Dec 15 2014 (07:27)
Passenger 1: Can/Mod (Booking Status: W/L 30,PQWL)
Chart PREPARED
Mumbai LTT - Haridwar AC SF Express (PT)/12171
Other Trains in the News
The Shortest Route between NK and HW is 29 km (2%) shorter.
Travel Time: 25h 20m     9 halts
Distance: 1602 km     Avg Speed: 63 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 11:05
Nashik Road/NK 
Platform# 2
 
Mon
 
 
Thu
 
 
Arrives @ 12:25 +1 night
HW/Haridwar 
Platform# 6,7
 
 
Tue
 
 
Fri
 
Type: AC SuperFast
Rake Zone: CR/Central
Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 12171/Mumbai LTT - Haridwar AC SF Express (PT) JCO 22/01/2024, 25/01/24, 29/01/24 and 01/02/2024 will be fully cancelled.
Fri Dec 08, 2023 (06:42PM)
News History
🔹Due to power and traffic block of PF#4 at Virangana Lakshmibai Jhansi station for repair work of washable apron over Jhansi division, train no. 12171/Mumbai LTT - Haridwar AC SF Express (PT) JCO 14/09/2023, 18/09/2023, 21/09/2023, 25/09/2023 and 28/09/2023 will be fully cancelled.
Tue Sep 12, 2023 (03:50PM)
Restored from 20.02.2023 , which was cancelled due to foggy season.
Fri Feb 17, 2023 (08:54AM)
12171 LTT- Haridwar AC Express Bi-weekly o­n every Monday and Thursday from LTT JCO 01.12. 2022 to 27.02.2023.
Tue Jan 17, 2023 (04:16PM)
On 28 October - This Train is cancelled between Hazrat Nizamuddin and Haridwar , The train will be Terminated at NZM. 📢⚟ Standardization of trains with LHB Rakes JCF 04/10/2021 Ex. LTT Will Run Revised Coach Composition: ┃1A—1┃—┃2A—3┃—┃3A—15┃—┃PC—1┃—EOG—2┃ : 22 Coach.
Thu Oct 28, 2021 (10:04PM)
0 Follows
Rating: 4.6/5 (98 votes)
cleanliness - excellent (18)
punctuality - excellent (18)
food - good (13)
ticket avbl - good (17)
railfanning - excellent (16)
safety - excellent (16)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Mon Jan 31, 2011
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
Food is loaded at Igatpuri and Bhopal
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 A1
  3
 A2
  4
 A3
  5
 H1
  6
 PC
  7
 B1
  8
 B2
  9
 B3
 18
B12
 17
B11
 16
B10
 15
 B9
 14
 B8
 13
 B7
 12
 B6
 11
 B5
 10
 B4
 19
B13
 20
B14
 21
B15
 22
EOG
RSA - Rake Sharing
No RSA, Single HOG-enabled rake with PM @ LTT

Show ALL intermediate Stations

9 halts. 232 intermediate Stations between Nashik Road and Haridwar
#1
-166.7 km
/==/
Zone: CR
PF# 1
Speed: 56
Elev: 6m

07:55
Day: 1
34.6 km
18 intermediate stations
00:37
#2
-132.1 km
/==/
Zone: CR
PF# 4
Speed: 54
Elev: 9m
08:32
08:35
Day: 1
132.1 km
21 intermediate stations
02:28
#3
0.0 km
/==/
Zone: CR
PF# 2
Speed: 81
Elev: 551m
11:03
11:05
Day: 1
Xing with 11056/Godan Express | Mon,Thu
257.2 km
31 intermediate stations
03:10
#4
257.2 km
/==/
Zone: CR
PF# 6,7
Speed: 63
Elev: 205m
14:15
14:20
Day: 1
Remote Location Quota Starting and Charting Station
123.6 km
19 intermediate stations
01:58
#5
380.7 km
/==/
Zone: CR
PF# 2
Speed: 66
Elev: 302m
16:18
16:20
Day: 1
275.3 km
38 intermediate stations
04:10
#6
656.0 km
/==/
Zone: WCR
PF# 2,3
Speed: 73
Elev: 405m
20:30
20:40
Day: 1
Remote Location Quota Starting and Charting Station
291.8 km
39 intermediate stations
04:00
#7
947.8 km
/==/
Zone: NCR
PF# 4
Speed: 74
Elev: 258m
00:40
00:45
Day: 2
215.7 km
25 intermediate stations
02:55
#8
1163.5 km
%≡≡%
Zone: NCR
PF# 3
Speed: 63
Elev: 167m
03:40
03:42
Day: 2
187.7 km
29 intermediate stations
02:58
#9
1351.2 km
/==/
Zone: NR
PF# 2
Speed: 56
Elev: 207m
06:40
06:55
Day: 2
Remote Location Quota Starting and Charting Station
70.3 km
13 intermediate stations
01:15
#10
1421.5 km
/==/
Zone: NR
PF# 3
Speed: 44
Elev: 224m
08:10
08:12
Day: 2
107.2 km
13 intermediate stations
02:26
#11
1528.7 km
/==/
Zone: NR
PF# 1
Speed: 42
Elev: 272m
10:38
10:40
Day: 2
32.1 km
7 intermediate stations
00:46
#12
1560.8 km
/==/
Zone: NR
PF# 1
Speed: 44
Elev: 269m
11:26
11:28
Day: 2
41.6 km
9 intermediate stations
00:57
#13
1602.5 km
/==/
Zone: NR
PF# 6,7

Elev: 314m
12:25

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy