Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Did you know that the Ganga & Kaveri rivers are connected? ... by Mysore Varanasi Express - Vishwanath Joshi

Search PNRs
Post PNR

PNR: 630-xxxxxxx

PNR Forum Entry# 0
PREDICTIONS: confirm:16  rac:0  waitlist:0 
Journey: Sun Jan 29, 2012
Departure: PNBE/Patna Junction @ 20:55 PF#: 3,4
Arrival: LKO/Lucknow Charbagh NR @ 07:20 +1 night PF#: 4
Distance: 512 km / 1589 km
Travel Time: 10h 25m  7 halts
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0012#   |   Charting: < 17:00

Latest Status as of: Jan 26 2012 (02:40)
Passenger 1: Can/Mod (Booking Status: W/L 20,RLGN)
Chart NOT Prepared
Kumbh Express (PT)/12369
Other Trains in the News
The Shortest Route between PNBE and LKO is 1 km (0%) shorter.
Travel Time: 10h 25m     7 halts
Distance: 512 km     Avg Speed: 49 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 20:55
Patna Junction/PNBE 
Platform# 3,4
Sun
Mon
 
Wed
Thu
 
Sat
Arrives @ 07:20 +1 night
LKO/Lucknow Charbagh NR 
Platform# 4
Sun
Mon
Tue
 
Thu
Fri
 
Type: SuperFast
Rake Zone: ER/Eastern
Latest News
(You need to double-check/verify this info yourself)
Due to remodelling works at Varanasi yard, it will be diverted via KIUL-HJP-GKP-LKO till JCO 14/10/2023 from HWH.
Sun Sep 24, 2023 (10:30PM)
News History
Will be converted to LHB rakes wef 13.12.2023 ex HWH & 14.12.2023 ex DDN
Sat Aug 05, 2023 (02:17PM)
ЁЯФ╣ Due to traffic block o┬нn Moradabad Division in connection with commissioning of additional Loop Line & provision of Electronic Interlocking at Banthra station, Train no. 12369/Kumbh Express (PT) JCO 13/05/2023 and 14/05/2023 will be fully cancelled.
Tue May 09, 2023 (02:51PM)
тАв JCO 26.03.2023 will be diverted to run via - Bandel, Barddhaman due to Traffic & Power Block for replacement of existing Electronic Interlocking at Belanagar Station over ER.
Sat Mar 25, 2023 (01:00PM)
рд╢реНрд░реА рдЧреБрд░реВ рдЧреЛрд╡рд┐рдиреНрдж рд╕рд┐рдВрд╣ рдЬреА рдорд╣рд╛рд░рд╛рдЬ рдХреА 356рд╡реАрдВ рдЬрдпрдВрддреА рдХреЗ рдЕрд╡рд╕рд░ рдкрд░ рдкреВрд░реНрд╡ рдордзреНрдп рд░реЗрд▓рд╡реЗ рдХреЗ рдкрдЯрдирд╛ рд╕рд╛рд╣рд┐рдм рд╕реНрдЯреЗрд╢рди рдкрд░ 21 рджрд┐рд╕рдореНрдмрд░, 2022 рд╕реЗ 04 рдЬрдирд╡рд░реА, 2023 рддрдХ рдЕрд╕реНрдерд╛рдпреА рддреМрд░ рдкрд░ 02 рдорд┐рдирдЯ рдХрд╛ рдард╣рд░рд╛рд╡ рдкреНрд░рджрд╛рди рдХрд┐рдпрд╛ рдЬрд╛рдПрдЧрд╛ред
Wed Dec 21, 2022 (11:19PM)
Train cancelled from 1st Dec 2022 to 28th Feb 2023.
Fri Nov 18, 2022 (10:42AM)
Will remain cancelled between 01/12/2022 to 27/02/2023 due to upcoming foggy season.
Fri Nov 18, 2022 (08:16AM)
Due to late arrival of corresponding down link train, 12369 UP Howrah тАУ Dehradun Kumbha Express will leave Howrah at 15:05 hrs. today (03.07.2022) instead of its scheduled departure time at 13:00 hrs.
Sun Jul 03, 2022 (12:52PM)
JCO 20.06.22 rescheduled by 2 hours 15 min will depart at 15:15(3:15 pm)
Mon Jun 20, 2022 (07:24AM)
JCO 19.06.22 rescheduled by 4 hours 10 min will depart at 16:10(4:10 pm)
Sun Jun 19, 2022 (09:29AM)
Due to late arrival of corresponding down link train, 12369 UP Howrah тАУ Dehradun Kumbha Express will leave Howrah at 15:30 hrs. today (04.06.2022) instead of its scheduled departure time at 13:00 hrs.
Sat Jun 04, 2022 (12:18PM)
тЮбя╕ПDue to late arrival of corresponding down link train, journey commencing on 12.05.2022 will be rescheduled to leave Howrah at 18:50 Hours on 12.05.2022 instead of its scheduled departure time at 13:00 Hours.тЮбя╕ПJourney Commencing on 18 and 19.05.2022 will be regulated for 1 hour enroute.
Fri May 13, 2022 (08:11PM)
Due to late arrival of corresponding down link train, journey commencing on 12.05.2022 will be rescheduled to leave Howrah at 18:50 Hours on 12.05.2022 instead of its scheduled departure time at 13:00 Hours.
Thu May 12, 2022 (11:30AM)
Due to late arrival of corresponding down link train, journey commencing on 11.05.2022 will be rescheduled to leave Howrah at 23:00 Hours on 11.05.2022 instead of its scheduled departure time at 13:00 Hours.
Wed May 11, 2022 (12:38PM)
Kolkata, May 4, 2022; Due to late arrival of corresponding down link train, 12369 UP Howrah тАУ Dehradun Kumbha Express will leave Howrah at 17;00 hrs. today (04.05.2022) instead of its scheduled departure time at 13;00 hrs.
Wed May 04, 2022 (08:22PM)
ЁЯУв Due to traffic and power block in Moradabad Division of NR, JCO 09.04.2022 will be diverted via Shahjahanpur-Pilibhit-Bareilly...
Fri Apr 08, 2022 (03:52AM)
06.01.2022 рдХреЛ рд╢реБрд░реВ рд╣реЛрдиреЗ рд╡рд╛рд▓реА рдХреЛ рд╣рд╛рд╡реЬрд╛ рд╕реЗ 300 рдорд┐рдирдЯ рдкреБрдирд░реНрдирд┐рд░реНрдзрд╛рд░рд┐рдд рдХрд┐рдпрд╛ рдЬрд╛рдПрдЧрд╛
Sun Jan 02, 2022 (02:26PM)
рд╢реНрд░реА рдЧреБрд░реВ рдЧреЛрд╡рд┐рдВрдж рд╕рд┐рдВрд╣ рдЬреА рдорд╣рд╛рд░рд╛рдЬ рдХреЗ 355рд╡реЗрдВ рдкреНрд░рдХрд╛рд╢ рдкрд░реНрд╡ рдХреЗ рдЕрд╡рд╕рд░ рдкрд░ рд╢реНрд░рджреНрдзрд╛рд▓реБрдУрдВ рдХреА рд╕реБрд╡рд┐рдзрд╛ рдХреЗ рд▓рд┐рдП рджрд┐рдирд╛рдВрдХ 01.01.2022 рд╕реЗ 15.01.2022 рддрдХ рдкрдЯрдирд╛ рд╕рд╛рд╣рд┐рдм рд╕реНрдЯреЗрд╢рди рдкрд░ 02 рдорд┐рдирдЯ рдХрд╛ рдЕрд╕реНрдерд╛рдпреА рдард╣рд░рд╛рд╡ рдкреНрд░рджрд╛рди рдХрд┐рдпрд╛ рдЬрд╛ рд░рд╣рд╛ рд╣реИред (20:20/20:22)
Tue Dec 28, 2021 (03:15PM)
Due to Non Interlocking work in Moradabad Division, 02369 Howrah - Dehradun special (journey commencing on 25.10.2021 & 27.10.2021) & 02327 Howrah - Dehradun special (journey commencing on 26.10.2021) will be short terminated at Lucknow.
Sun Oct 24, 2021 (08:43AM)
8 Follows
Rating: 3.5/5 (129 votes)
cleanliness - good (22)
punctuality - good (22)
food - good (21)
ticket avbl - average (21)
u/r coach - average (15)
railfanning - good (21)
safety - good (22)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Thu Dec 31, 2009
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
 S1
  5
 S2
  6
 PC
  7
 H1
  8
 A1
  9
 A2
 16
EOG
 15
 M2
 14
 M1
 13
 B4
 12
 B3
 11
 B2
 10
 B1
RSA - Rake Sharing
12327/12328 - 3 rakes | PM @ HWH


Show ALL intermediate Stations

7 halts. 101 intermediate Stations between Patna Junction and Lucknow Charbagh NR
#1
-531.8 km
/==/
Zone: ER
PF# 11
Speed: 88
Elev: 12m

13:00
Day: 1
200.5 km
61 intermediate stations
02:29
#2
-331.3 km
/==/
Zone: ER
PF# 4
Speed: 66
Elev: 106m
15:29
15:34
Day: 1
Remote Location Quota Starting and Charting Station
25.1 km
6 intermediate stations
00:23
#3
-306.2 km
/==/
Zone: ER
Speed: 100
Elev: 178m
15:57
15:59
Day: 1
56.4 km
7 intermediate stations
00:34
#4
-249.8 km
/==/
Zone: ER
PF# 2
Speed: 70
Elev: 248m
16:33
16:35
Day: 1
29.0 km
5 intermediate stations
00:25
#5
-220.8 km
/==/
Zone: ER
PF# 2
Speed: 39
Elev: 260m
17:00
17:02
Day: 1
Xing with 03274/Patna - Deoghar MEMU Express Special | Sun,Mon,Wed,Thu,Sat
44.0 km
7 intermediate stations
01:08
#6
-176.8 km
/==/
Zone: ECR
PF# 3
Speed: 92
Elev: 138m
18:10
18:15
Day: 1
26.1 km
3 intermediate stations
00:17
#7
-150.7 km
/==/
Zone: ECR
PF# 1
Speed: 69
Elev: 87m
18:32
18:34
Day: 1
27.4 km
11 intermediate stations
00:24
#8
-123.3 km
/==/
Zone: ECR
PF# 3
Speed: 79
Elev: 153m
18:58
19:00
Day: 1
34.1 km
12 intermediate stations
00:26
#9
-89.2 km
/==/
Zone: ECR
PF# 3
Speed: 94
Elev: 144m
19:26
19:28
Day: 1
43.8 km
14 intermediate stations
00:28
#10
-45.3 km
/==/
Zone: ECR
Speed: 58
Elev: 48m
19:56
19:58
Day: 1
Experimental Halt Wef 17/03/2024
45.3 km
14 intermediate stations
00:47
#11
0.0 km
/==/
Zone: ECR
PF# 3,4
Speed: 72
Elev: 57m
20:45
20:55
Day: 1
Remote Location Quota Starting & Charting Station.
49.0 km
12 intermediate stations
00:41
#12
49.0 km
/==/
Zone: ECR
PF# 2
Speed: 87
Elev: 59m
21:36
21:38
Day: 1
68.5 km
18 intermediate stations
00:47
#13
117.5 km
/==/
Zone: ECR
PF# 2
Speed: 94
Elev: 68m
22:25
22:27
Day: 1
36.2 km
7 intermediate stations
00:23
#14
153.7 km
/==/
Zone: ECR
PF# 3
Speed: 37
22:50
22:52
Day: 1
57.7 km
11 intermediate stations
01:33
#15
211.4 km
/==/
Zone: ECR
PF# 4,6
Speed: 16
Elev: 79m
00:25
00:35
Day: 2
18.1 km
5 intermediate stations
01:10
#16
229.5 km
/==/
Zone: NR
PF# 6
Speed: 60
Elev: 77m
01:45
01:55
Day: 2
143.3 km
24 intermediate stations
02:23
#17
372.8 km
/==/
Zone: NR
PF# 3
Speed: 80
Elev: 95m
04:18
04:20
Day: 2
50.4 km
5 intermediate stations
00:38
#18
423.3 km
/==/
Zone: NR
Speed: 38
Elev: 108m
04:58
05:00
Day: 2
89.0 km
12 intermediate stations
02:20
#19
512.3 km
%≡≡%
Zone: NR
PF# 4
Speed: 63
Elev: 124m
07:20
07:30
Day: 2
Remote Location Quota Starting and Charting Station
Xing with 12238/Begampura Express | Sun,Mon,Tue,Thu,Fri
234.8 km
35 intermediate stations
03:43
#20
747.1 km
/==/
Zone: NR
PF# 2
Speed: 57
Elev: 169m
11:13
11:15
Day: 2
Xing with 13152/Jammu Tawi - Kolkata Express | Sun,Mon,Tue,Thu,Fri
90.3 km
15 intermediate stations
01:35
#21
837.4 km
/==/
Zone: NR
PF# 4
Speed: 65
Elev: 193m
12:50
12:58
Day: 2
140.4 km
22 intermediate stations
02:10
#22
977.8 km
/==/
Zone: NR
PF# 3
Speed: 41
Elev: 257m
15:08
15:10
Day: 2
27.1 km
5 intermediate stations
00:40
#23
1004.9 km
/==/
Zone: NR
PF# 4
Speed: 24
Elev: 314m
15:50
16:00
Day: 2
Xing with 19032/Yoga Express | Sun,Mon,Tue,Thu,Fri
51.8 km
5 intermediate stations
02:10
#24
1056.7 km
/--/
Zone: NR

Elev: 637m
18:10

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy