Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

হাওড়া - বর্দ্ধমান কর্ড লাইনে যান, 130 কিমি বেগে ট্রেন যাওয়াও কালবৈশাখী ঝড়ের থেকে ভয়ঙ্কর! - Jishnu Thakur

Search PNRs
Post PNR

PNR: 223-xxxxxxx

PNR Forum Entry# 0
Journey: Sat Apr 28, 2012
Departure: UMB/Ambala Cantt. Junction @ 10:05 PF#: 2
Arrival: LKO/Lucknow Charbagh NR @ 20:05 PF#: 1
Distance: 599 km / 1805 km
Travel Time: 10h 0m  3 halts
Class: Sleeper - SL   |   Tot Seats: Avbl-0133#   |   Charting: < 21:15

Latest Status as of: Apr 06 2012 (16:11)
Passenger 2: Confirmed (Booking Status: S4,48,GN)
Chart NOT Prepared
Gurumukhi SF Express/12326
Other Trains in the News
This is the Shortest Route between UMB and LKO.
Travel Time: 10h 0m     3 halts
Distance: 599 km     Avg Speed: 60 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 10:05
Ambala Cantt. Junction/UMB 
Platform# 2
 
 
 
 
 
 
Sat
Arrives @ 20:05
LKO/Lucknow Charbagh NR 
Platform# 1
 
 
 
 
 
 
Sat
Type: SuperFast
Rake Zone: ER/Eastern
Latest News
(You need to double-check/verify this info yourself)
On 13 & 20 April Saturday, 12326/Nangal Dam - Kolkata will be Diverted to run via DDU- Gaya - ASN instead of DDU -Patna- ASN.
Fri Apr 12, 2024 (08:02PM)
News History
Will run with LHB Rake w.e.f. 15.04.2023. New Coach Composition of LHB Rake: SLR-1, GS-2, SL-6, 3AC Economy-2, 3AC-2, 2AC-1, EOG-1=15 Coaches New Coach Composition w.e.f. 19.08.2023: SLR-1, GS-2, SL-2, 3AC Economy-5, 3AC-3, 2AC-1, EOG-1=15 Coaches
Thu Apr 06, 2023 (09:13PM)
• JCO 04.02.2023 & 11.02.2023 will remain cancelled due to Traffic & Power Block for dismantling of existing ROB no. 213 at Barddhaman over ER.
Tue Jan 31, 2023 (08:01AM)
🔹12326 Gurumukhi SF Express (journey commencing on 24.12.2022 & 07.01.2023) has been diverted via Pt. DD Upadhyaya Jn. - Gaya - Dhanbad - Asansol. 🔹श्री गुरू गोविन्द सिंह जी महाराज की 356वीं जयंती के अवसर पर पूर्व मध्य रेलवे के पटना साहिब स्टेशन पर 21 दिसम्बर, 2022 से 04 जनवरी, 2023...
more...
तक अस्थायी तौर पर 02 मिनट का ठहराव प्रदान किया जाएगा।
Thu Dec 22, 2022 (08:52PM)
श्री गुरू गोविन्द सिंह जी महाराज की 356वीं जयंती के अवसर पर पूर्व मध्य रेलवे के पटना साहिब स्टेशन पर 21 दिसम्बर, 2022 से 04 जनवरी, 2023 तक अस्थायी तौर पर 02 मिनट का ठहराव प्रदान किया जाएगा।
Wed Dec 21, 2022 (11:06PM)
As per NTES, train is cancelled till 26.02 2022
Sun Jan 02, 2022 (11:09PM)
श्री गुरू गोविंद सिंह जी महाराज के 355वें प्रकाश पर्व के अवसर पर श्रद्धालुओं की सुविधा के लिए दिनांक 01.01.2022 से 15.01.2022 तक पटना साहिब स्टेशन पर 02 मिनट का अस्थायी ठहराव प्रदान किया जा रहा है। (06:03/06:05)
Tue Dec 28, 2021 (02:55PM)
Cancelled till 26.02.2022 due to foggy weather.
Mon Dec 13, 2021 (05:21PM)
📢 JCO 14.08.2021 will be controlled suitably en-route for 45 minutes
Wed Aug 11, 2021 (10:48PM)
0 Follows
Rating: 4.1/5 (60 votes)
cleanliness - good (10)
punctuality - excellent (11)
food - good (10)
ticket avbl - average (11)
u/r coach - excellent (5)
railfanning - excellent (8)
safety - excellent (10)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Tue Oct 12, 2010
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
HCP
  2
EOG
  3
 A1
  4
 B3
  5
 B2
  6
 B1
  7
 M5
  8
 M4
  9
 M3
 16
SLR
 15
GEN
 14
GEN
 13
 S1
 12
 S2
 11
 M1
 10
 M2
RSA - Rake Sharing

Show ALL intermediate Stations

3 halts. 100 intermediate Stations between Ambala Cantt. Junction and Lucknow Charbagh NR
#1
-157.3 km
/--/
Zone: NR
PF# 1
Speed: 94
Elev: 354m

07:00
Day: 1
20.3 km
1 intermediate stations
00:13
#2
-137.1 km
/--/
Zone: NR
PF#: 1
Speed: 76
Elev: 285m
07:13
07:15
Day: 1
35.3 km
3 intermediate stations
00:28
#3
-101.8 km
/--/
Zone: NR
PF# 1
Speed: 47
Elev: 282m
07:43
07:48
Day: 1
48.5 km
8 intermediate stations
01:02
#4
-53.3 km
/--/
Zone: NR
PF# 3
Speed: 67
Elev: 267m
08:50
09:12
Day: 1
53.3 km
6 intermediate stations
00:48
#5
0.0 km
/==/
Zone: NR
PF# 2
Speed: 65
Elev: 273m
10:00
10:05
Day: 1
81.1 km
12 intermediate stations
01:15
#6
81.1 km
/==/
Zone: NR
PF# 4
Speed: 56
Elev: 275m
11:20
11:25
Day: 1
193.1 km
35 intermediate stations
03:27
#7
274.2 km
/==/
Zone: NR
PF# 1,3
Speed: 68
Elev: 193m
14:52
15:00
Day: 1
Remote Location Quota Starting and Charting Station.
90.3 km
15 intermediate stations
01:20
#8
364.5 km
/==/
Zone: NR
PF# 1
Speed: 63
Elev: 169m
16:20
16:22
Day: 1
234.8 km
35 intermediate stations
03:43
#9
599.3 km
/==/
Zone: NR
PF# 1
Speed: 64
Elev: 124m
20:05
20:15
Day: 1
Remote Location Quota Starting and Charting Station
282.8 km
43 intermediate stations
04:25
#10
882.1 km
/==/
Zone: NR
PF# 9
Speed: 13
Elev: 77m
00:40
00:50
Day: 2
18.1 km
5 intermediate stations
01:25
#11
900.2 km
/==/
Zone: ECR
PF# 2,3
Speed: 67
Elev: 79m
02:15
02:25
Day: 2
211.4 km
51 intermediate stations
03:10
#12
1111.6 km
/==/
Zone: ECR
PF# 1
Speed: 56
Elev: 57m
05:35
05:45
Day: 2
Remote Location Quota Starting and Charting Station
123.3 km
42 intermediate stations
02:13
#13
1234.9 km
/==/
Zone: ECR
PF# 5
Speed: 54
Elev: 153m
07:58
08:00
Day: 2
53.5 km
15 intermediate stations
01:00
#14
1288.4 km
/==/
Zone: ECR
PF# 2
Speed: 82
Elev: 138m
09:00
09:05
Day: 2
44.0 km
7 intermediate stations
00:32
#15
1332.4 km
/==/
Zone: ER
PF# 1
Speed: 67
Elev: 260m
09:37
09:39
Day: 2
110.6 km
20 intermediate stations
01:39
#16
1442.9 km
/==/
Zone: ER
PF# 5
Speed: 62
Elev: 106m
11:18
11:28
Day: 2
204.7 km
62 intermediate stations
03:22
#17
1647.6 km
/==/
Zone: ER
PF# 3

Elev: 6m
14:50

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy