Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

RailFans - हमको देख देख दुनिया जले, हमको ज़माने से क्या

Search Gallery
Post PNR
Large Station Board;
Entry# 860179-0
Large Station Board;
Entry# 1756125-0
Platform Pic; Large Station Board;
Entry# 2541146-7

KCD/Kurichedu (1 PFs)
कुरिचेडु
కురిచేడు


Track: Double Electric-Line

Updated: Dec 30 2022 (08:46) by dhssravikiran
Number of Platforms: 1
Number of Halting Trains: 10
Number of Originating Trains: 0
Number of Terminating Trains: 0
Podili - Vinukonda Road, Kurichedu, Prakasam, 523304
State: Andhra Pradesh
Elevation: n/a
Type: Regular
Category: NSG-6
Zone: SCR/South Central
Division: Guntur
No Recent News for KCD/Kurichedu
Nearby Stations in the News

0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 1 to 5 of 7 Pic/Video Blogs  next>>

4548 views
0

@KCD   50m late@KCD: Kurichedu &1 km/h Arrived Loop Line Halt ✅
×

3375 views
0

@POO 5 km 2 km @KCD   50m late@KCD: Kurichedu &94 km/h 95 Kmph Both Are Back To Back Xing With 17253 - GNT SC Express Loco - LGD WAG9 ✅
×

15384 views
0

@KCD 1 km 10 km @GKM   29m late@KCD: Kurichedu &111 km/h MPS SKIP Xing With 17229 - GNT DHNE Express Loco - KZJ WAG9
×

GNT/Guntur Junction


167546 views
9

Finally Donakonda - Kurichedu 12 KMS double line opened in the part of GNT - GTL Doubling.Of the 401 KMS of doubling route, 92 KMS of doubling has been completed so far.There is still 309 km to be doubled.It aims to complete (𝐊𝐔𝐑𝐈𝐂𝐇𝐄𝐃𝐔 - 𝐆𝐔𝐍𝐃𝐋𝐀𝐊𝐀𝐌𝐌𝐀 𝟏𝟏 𝐊𝐌𝐒, 𝐓𝐀𝐑𝐋𝐔𝐏𝐀𝐃𝐔 - 𝐆𝐀𝐉𝐉𝐄𝐋𝐀𝐊𝐎𝐍𝐃𝐀 𝟐𝟓 𝐊𝐌𝐒) 36 of doubling by 2022 March.
×

GNT/Guntur Junction


167546 views
9

Finally Donakonda - Kurichedu 12 KMS double line opened in the part of GNT - GTL Doubling.Of the 401 KMS of doubling route, 92 KMS of doubling has been completed so far.There is still 309 km to be doubled.It aims to complete (𝐊𝐔𝐑𝐈𝐂𝐇𝐄𝐃𝐔 - 𝐆𝐔𝐍𝐃𝐋𝐀𝐊𝐀𝐌𝐌𝐀 𝟏𝟏 𝐊𝐌𝐒, 𝐓𝐀𝐑𝐋𝐔𝐏𝐀𝐃𝐔 - 𝐆𝐀𝐉𝐉𝐄𝐋𝐀𝐊𝐎𝐍𝐃𝐀 𝟐𝟓 𝐊𝐌𝐒) 36 of doubling by 2022 March.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy