Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal - Train Search + Time-Tables + Avl Calendar + Forum

Bandra Garib-Rath - नाम से गरीब, लेकिन मेरे दिल के करीब - Abdul Rehman

Search Gallery
Post PNR
no description available
Entry# 2346356-0

GWO/Gwalior NG (2 PFs)
ग्वालियर एनजी


Track: Construction - New Line

Updated: Dec 11 2023 (09:50)
Number of Platforms: 2
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
Racecourse Rd, Gwalior
State: Madhya Pradesh
Elevation: 213 m above sea level
Type: Abandoned
Category: n/a
Zone: NCR/North Central
Division: VGL Jhansi
No Recent News for GWO/Gwalior NG
Nearby Stations in the News

0 Follows
Rating: 1.2/5 (8 votes)
cleanliness - poor (1)
porters/escalators - poor (1)
food - poor (1)
transportation - poor (1)
lodging - poor (1)
railfanning - poor (1)
sightseeing - poor (1)
safety - poor (1)

Departures
Arrivals
Station Map
Forum
News
Gallery
Timeline
RF Club
Station Pics
Tips

Picture & Video Gallery

Page#    Showing 1 to 5 of 20 Pic/Video Blogs  next>>

52171/Gwalior - Sheopur NG Passenger

GWO/Gwalior NG


69948 views
10

The NG tracks at GWL still exist. They are adjacent to PF 4, though no trains ply from there of course, now. The abandoned rakes were kept there. Do note the built year 1992. I wouldn't even call it a yard, since there are no facilities there, just a dumping ground now. An inside view of the NG train is also there. The tracks curved via Ghosipura inside Gwalior [at speeds of ~5 kph] before hitting the highway [towards Dholpur] [I spotted another NG station there, abandoned of course] and then turning course. The NG alignment then met the BG alignment...
×

52171/Gwalior - Sheopur NG Passenger

GWO/Gwalior NG


69948 views
10

The NG tracks at GWL still exist. They are adjacent to PF 4, though no trains ply from there of course, now. The abandoned rakes were kept there. Do note the built year 1992. I wouldn't even call it a yard, since there are no facilities there, just a dumping ground now. An inside view of the NG train is also there. The tracks curved via Ghosipura inside Gwalior [at speeds of ~5 kph] before hitting the highway [towards Dholpur] [I spotted another NG station there, abandoned of course] and then turning course. The NG alignment then met the BG alignment...
×

52171/Gwalior - Sheopur NG Passenger

GWO/Gwalior NG


69948 views
10

The NG tracks at GWL still exist. They are adjacent to PF 4, though no trains ply from there of course, now. The abandoned rakes were kept there. Do note the built year 1992. I wouldn't even call it a yard, since there are no facilities there, just a dumping ground now. An inside view of the NG train is also there. The tracks curved via Ghosipura inside Gwalior [at speeds of ~5 kph] before hitting the highway [towards Dholpur] [I spotted another NG station there, abandoned of course] and then turning course. The NG alignment then met the BG alignment...
×

52171/Gwalior - Sheopur NG Passenger

GWO/Gwalior NG


69948 views
10

The NG tracks at GWL still exist. They are adjacent to PF 4, though no trains ply from there of course, now. The abandoned rakes were kept there. Do note the built year 1992. I wouldn't even call it a yard, since there are no facilities there, just a dumping ground now. An inside view of the NG train is also there. The tracks curved via Ghosipura inside Gwalior [at speeds of ~5 kph] before hitting the highway [towards Dholpur] [I spotted another NG station there, abandoned of course] and then turning course. The NG alignment then met the BG alignment...
×

52171/Gwalior - Sheopur NG Passenger

GWO/Gwalior NG


69948 views
10

The NG tracks at GWL still exist. They are adjacent to PF 4, though no trains ply from there of course, now. The abandoned rakes were kept there. Do note the built year 1992. I wouldn't even call it a yard, since there are no facilities there, just a dumping ground now. An inside view of the NG train is also there. The tracks curved via Ghosipura inside Gwalior [at speeds of ~5 kph] before hitting the highway [towards Dholpur] [I spotted another NG station there, abandoned of course] and then turning course. The NG alignment then met the BG alignment...
×

52171/Gwalior - Sheopur NG Passenger

GWO/Gwalior NG


69948 views
10

The NG tracks at GWL still exist. They are adjacent to PF 4, though no trains ply from there of course, now. The abandoned rakes were kept there. Do note the built year 1992. I wouldn't even call it a yard, since there are no facilities there, just a dumping ground now. An inside view of the NG train is also there. The tracks curved via Ghosipura inside Gwalior [at speeds of ~5 kph] before hitting the highway [towards Dholpur] [I spotted another NG station there, abandoned of course] and then turning course. The NG alignment then met the BG alignment...
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


269116 views
12

Gwalior Sheopur GC Project update :- Sumaoli - Jora Alapur CRS CRS Inspection is successfully completed All new Electronic interlocking has been installed successfully at Jora alapur Station between Gwalior-Sheopurkalan section of Jhansi Div. in connection with newly commissioned Broad Gauge line having 2 Nos. of lines & 2 sidings with 28 Nos. of routes.Credit by:- Udata Kabutar
×

JPO/Jora Alapur


217029 views
6

JPO (NCR)
×

JPO/Jora Alapur


217029 views
6

JPO (NCR)
×

JPO/Jora Alapur


217029 views
6

JPO (NCR)
×

JPO/Jora Alapur


217029 views
6

JPO (NCR)
×

SOE/Sheopur Kalan


249406 views
12

श्योपुर कलां - कोटा रेलवे ट्रैक के लिए सर्वे हुआ पूरा, इस रूट पर बनेंगे 8 रेलवे स्टेशन।
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×

BIB/Birpur


268631 views
15

The work on the approved broad gauge railway line from Gwalior to Digod (Kota) in Rajasthan via Sheopur is being done at a fast pace, the agencies involved in the work of the railway line have prepared the pillars of the bridge on the Kuno River near Birpur . Now the work of building the bridge is also being done at a very fast pace.
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy