Full Site Search  
Fri Nov 17, 2017 23:00:50 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;


AFK/Angamaly for Kalady (3 PFs)
അങ്കമാലി (കാലടി)     अंगमालि (कालडि)

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 48
Number of Originating Trains: 0
Number of Terminating Trains: 0
Angamaly (Ernakulam), Phone: 0484-2452340
State: Kerala
Elevation: 17 m above sea level
Zone: SR/Southern
Division: Thiruvananthapuram (Trivandrum)
 
 
1 Travel Tips
No Recent News for AFK/Angamaly for Kalady
Nearby Stations in the News

Rating: 4.3/5 (7 votes)
cleanliness - good (1)
porters/escalators - average (1)
food - good (1)
transportation - excellent (1)
lodging - excellent (1)
railfanning - excellent (1)
sightseeing - n/a (0)
safety - excellent (1)

Nearby Stations

KUC/Karukkutty 5 km     CWR/Chovvara 6 km     KRAN/Koratti Angadi 9 km     AWY/Aluva (Alwaye) 9 km     DINR/Divine Nagar 13 km     KLMR/Kalamassery 15 km     CKI/Chalakkudy 15 km     IPL/Idappally 20 km     IJK/Irinjalakkuda 22 km     ERN/Ernakulam Town (North) 26 km    

Station News

Page#    Showing 1 to 13 of 13 News Items  
Oct 07 2017 (13:36)  നെടുമ്പാശ്ശേരി റെയില്‍വേ സ്റ്റേഷന്‍ ഉടന്‍ പ്രവര്‍ത്തനം തുടങ്ങും. (www.mathrubhumi.com)
back to top
Other NewsSR/Southern  -  

News Entry# 319307     
   Past Edits
Oct 07 2017 (13:36)
Station Tag: Angamaly for Kalady/AFK added by MCPNBR~/261443

Oct 07 2017 (13:36)
Station Tag: Aluva (Alwaye)/AWY added by MCPNBR~/261443
Posted by: MCPNBR~  451 news posts
 
 
ന്യൂഡല്‍ഹി: നെടുമ്പാശ്ശേരി വിമാനത്താവളത്തിനടുത്തുള്ള റെയില്‍വേ സ്റ്റേഷന്‍ ഉടന്‍ പ്രവര്‍ത്തനം തുടങ്ങുമെന്ന് കേന്ദ്ര റെയില്‍വേ സഹമന്ത്രി രാജന്‍ ഗൊഹെയില്‍ ഉറപ്പുനല്‍കിയതായി കെ.വി. തോമസ് എം.പി. അറിയിച്ചു. ഇപ്പോള്‍ പ്രവര്‍ത്തനത്തിലുള്ള അങ്കമാലി-നെടുമ്പാശ്ശേരി ലെവല്‍ക്രോസിങ് പൂട്ടിക്കഴിയുന്നതോട നെടുമ്പാശ്ശേരി റെയില്‍വേ സ്റ്റേഷന്‍ പ്രവര്‍ത്തനം തുടങ്ങും. ഈ റെയില്‍വേ ക്രോസിങ് അടയ്ക്കാമെന്ന് എറണാകുളം ജില്ലാ കളക്ടര്‍ റെയില്‍വേ മന്ത്രാലയത്തെ അറിയിച്ചു.
മുംബൈയിലെ കുര്‍ളയില്‍നിന്ന് ഗുരുവായൂരിലേക്ക് നേരിട്ട് തീവണ്ടി സര്‍വീസ് പ്രായോഗികമല്ലെന്ന് മന്ത്രി അറിയിച്ചതായും കെ.വി. തോമസ് പറഞ്ഞു.
Aug 06 2017 (12:14)  Sabari rail ; an uphill task (www.newindianexpress.com)
back to top
Other NewsSR/Southern  -  

News Entry# 310918   Blog Entry# 2373351     
   Past Edits
Aug 06 2017 (12:14)
Station Tag: Angamaly for Kalady/AFK added by Rail Fanning~/718429
Stations:  Angamaly for Kalady/AFK  
 
 
Giving a new lease of life to the hopes of the Sabarimala pilgrims, the Railways began the work of the proposed Sabari rail after a long hiatus. The Railways has begun work on the stretch between Angamaly and Kalady which is part of the long-pending Sabari Rail project. According to Railway area manger, Ernakulam, the pre-non interlocking works of the 7.5 km long stretch has been started. Due to the work on the the stretch, train traffic has been regulated on the mainline near Angamaly station, he said. The work on the Kalady station and the overbridge across Periyar river is almost finished.
District administration officers said steps have been taken to reopen the two special offices set up for the project.
...
more...
The offices were closed a down a couple of years ago after the project hit a roadblock. The office at Perumbavoor has already started functioning and the other at Muvattupuzha will become operational in a couple of days.
Earlier, the district administration submitted a proposal to the state government seeking restoration of the special offices in order to speed up the land acquisition formalities. The government has also sanctioned the appointment of staff to the posts required to coordinate the works. The staff include tahasildar, deputy tahasildar, village officer, revenue inspector, surveyors, clerks, draftsmen, and attendants etc. As many as 40 from the Revenue Department will be posted at the special offices. Around 132 hectare of land which comes under 490 survey numbers in three taluks will have to be acquired for the project and the revenue officials will coordinate the work, said the district administration.
Sabari Central Action Council convenor Jijo Joseph said with the Centre allocating Rs 213 crore for the Angamaly-Sabari railway line in the 2017-18 railway budget, the project received a lease of life. The project had been allocated Rs 50 crore as the first instalment from the state government’s share of funding to begin the work. The project was allotted a sum of Rs 40 crore in the previous Union Railway Budget.
Recently, the officials submitted a revised estimate of Rs 2,815 crore to the Central government. They are yet to receive an in principal nod from the Union Government.
When the railway line covering five municipalities- namely Pala, Thodupuzha, Muvattupuzha, Kothamangalam, Perumbavoor and Angamaly, and 11 other small towns was proposed in 1996-97 to cater to the travel needs of Sabarimala pilgrims, the project was estimated to cost around Rs 540 crore. Later the project estimate was revised to Rs 1,550 crore in 2011, an official said.
With the realignment of the route from Anthinadu in Kottayam to Erumeli, the length of the 120-km proposed railway project, which will put the hill shrine on the railway map of the country, has come down to 111 km. Also the protest against the project has died down to some extent, he added.
After dilly-dallying over cost sharing, the state government agreed to a 51:49 equity with the Railways for the Angamaly-Sabarimala railway project. The decision was arrived at in 2016 after a long drawn tussle with the Center. The decision was taken after other states agreed to share the cost of railway projects and development of rail infrastructure. The Centre had made it mandatory in 2011 for the state governments to bear half of the total cost of the rail projects.
On hilly tracts
The project will be executed by Kerala Rail Development Corporation Ltd (KRDCL) with 51:49 equity between the state and Railways
Recently, officials submitted a revised estimate of Rs 2,815 crore to the Center
They are yet to receive an in principal nod from the authorities
When the rail line was proposed in 1996-97, to cater to the travel needs of Sabarimala pilgrims, the estimated expenditure of the project was around Rs 540 crore. Later the project estimate got revised to Rs 1,550 crore in 2011
The rail project with a length of 111 km passes through five municipalities- namely Pala, Thodupuzha, Muvattupuzha, Kothamangalam, Perumbavoor and Angamali, and 11 other small towns
With the realignment of the route from Anthinadu in Kottayam to Erumeli, the length of the 120-km proposed railway line has come down to 111 km
The pre-non interlocking works on the 7.5 km long Angamali-Kalady stretch has begun
The state has communicated to Railways that it is ready to share 50 per cent of the cost of the two-decade-old project State has only acquired 24.4 hectares of out of the total 470 hectares of land required for the project
Centre sanctioned Rs 213 crore for the Angamaly-Sabari railway line in the 2017-18 rail budget

1239 views
Aug 07 2017 (11:12)
Akshay Nair~   1204 blog posts   2 correct pred (100% accurate)
Re# 2373351-1            Tags   Past Edits
Any idea when sabari rail line will open for public? In IRI, atlas is not showing angamali-nemom track as a new line.
May 14 2017 (11:12)  Peeved by railways' apathy, Innocent MP goes on hunger strike (english.manoramaonline.com)
back to top
PoliticsSR/Southern  -  

News Entry# 302430   Blog Entry# 2276624     
   Past Edits
May 14 2017 (11:12)
Station Tag: Angamaly for Kalady/AFK added by Rail Fanning~/718429

May 14 2017 (11:12)
Station Tag: Chalakkudy/CKI added by Rail Fanning~/718429
 
 
Innocent MP on Saturday kicked off a hunger strike against the central government for ignoring Kerala's interests in matters related to the railway. The actor-turned-politician wants the railway to complete the promised projects in his constituency, Chalakkudy, at the earliest.
Top on the list of demands is the allocation of stops for the Palaruvi Express at Angamaly and Chalakkudy railway stations. Innocent said he expected the central government to be sympathetic. He added that he would strengthen the agitation with more people’s participation in case a favorable response was not forthcoming.
The Member
...
more...
of Parliament sat in strike in front of the Chalakkudy railway station from 10 am to 2 pm. He alleged that the central government and the railway were yet to respond to a comprehensive plan related to the railway development in Chalakkudy after the 2014 general election.

3001 views
May 14 2017 (11:50)
MCPNBR~   2327 blog posts   104 correct pred (88% accurate)
Re# 2276624-1            Tags   Past Edits
Was it hunger strike? Strike after breakfast and before lunch.

2870 views
May 14 2017 (12:11)
Saurabh®~   3696 blog posts   46 correct pred (71% accurate)
Re# 2276624-2            Tags   Past Edits
Wo to is liye baithe thi ki kal raat ka khana hazam nahi hua tha

2921 views
May 14 2017 (13:06)
Guest: 3bcd365d   show all posts
Re# 2276624-3            Tags   Past Edits
Innoncent on what sense?

2125 views
May 14 2017 (23:04)
Rail Fanning~   2866 blog posts
Re# 2276624-4            Tags   Past Edits
Haha. Imran Sir, the name of the MP is 'Innocent'.He is also a Malayalam actor ! Got elected as an MP in the last elections.
Nov 29 2016 (10:18)  ശബരി റെയിൽ പദ്ധതി ഇനി പ്രധാനമന്ത്രിയുടെ മേൽനോട്ടത്തിൽ (www.manoramanews.com)
back to top
Commentary/Human InterestSR/Southern  -  

News Entry# 287097   Blog Entry# 2074868     
   Past Edits
Nov 29 2016 (10:18AM)
Station Tag: Angamaly for Kalady/AFK added by Rise Above Reservation/939187
Stations:  Angamaly for Kalady/AFK  
 
 
അങ്കമാലി-എരുമേലി ശബരി റെയിൽ പദ്ധതി ഇനി പ്രധാനമന്ത്രിയുടെ മേൽനോട്ടത്തിൽ. പ്രധാനമന്ത്രി നേരിട്ട് നിരീക്ഷിക്കുന്ന പ്രഗതി പദ്ധതിയിൽ ശബരി റെയിൽ പാത നിർമാണത്തെ ഉൾപ്പെടുത്തി. ഇതാദ്യമായാണ് കേരളത്തിൽ നിന്ന് ഒരു പദ്ധതി പ്രഗതിയിൽ ഉൾപ്പെടുത്തുന്നത്. എല്ലാമാസവുമുള്ള വിലയിരുത്തലും പദ്ധതി പൂർത്തിയാക്കുന്നതിനുള്ള സമയപരിധിയും ഇനിയുണ്ടാകും.
പ്രധാനമന്ത്രി നരേന്ദ്രമോഡി നേരിട്ട് നിരീഷിക്കുന്ന പ്രോ ആക്ടീവ് ഗവേണൻസ് ആൻഡ് ടൈംലി ഇംപ്ലിമെന്റേഷൻ പദ്ധയിലാണ് ശബരി റെയിൽപാതയെ ഉൾപ്പെടുത്തിയത്. ഇതിനു ശേഷം പദ്ധതി പ്രധാനമന്ത്രി നേരിട്ടു വിലയിരുത്തുന്ന യോഗവും നടന്നു. പദ്ധതി വേഗത്തിലാക്കാൻ ഏറ്റെടുക്കുന്ന ഭൂമിയുടെ അളവ് കുറയ്ക്കാൻ തീരുമാനമായിട്ടുണ്ട്. പാതയുടെ ഇരുഭാഗത്തായി മൂന്നു മീറ്റർ സ്ഥലമെടുക്കുന്നതു ശബരി പദ്ധതിയ്ക്കു ഒന്നര മീറ്ററായി കുറയ്ക്കും. ഇതനുസരിച്ചു കാലടി മുതൽ പെരുമ്പാവൂർ വരെ പുതിയ അതിർത്തിക്കലുകൾ സ്ഥാപിക്കും.
പദ്ധതിയുടെ പ്രത്യേക നടത്തിപ്പ് സംവിധാനം രൂപീകരിക്കാനുള്ള നടപടി വേഗത്തിലാക്കും. പ്രഗതിയിൽ ഉൾപ്പെടുത്തിയതിനു പിന്നാലെ പദ്ധതിയുടെ പുതുക്കിയ എസ്റ്റിമേറ്റ് അംഗീകരിക്കുന്ന
...
more...
ജോലികൾ റെയിൽവേ വേഗത്തിലാക്കി. എസ്റ്റിമേറ്റ് അംഗീകരിപ്പിക്കാനായി നിർമാണ വിഭാഗം ,അക്കൗണ്ട്സ് വിഭാഗത്തിന്റെ പിന്നാലെ നടക്കുകയാണു പതിവ്.
എന്നാൽ റെയിൽവേ ബോർഡിൽ നിന്നുള്ള പ്രത്യേക നിർദേശ പ്രകാരം 2600 കോടി രൂപയുടെ പുതുക്കിയ എസ്റ്റിമേറ്റ് അംഗീകരിക്കാനുള്ള അന്തിമ നടപടികൾ നടക്കുന്നതായാണ് സൂചന. അങ്കമാലി--ശബരി പാത പുനലൂർ വരെ നീട്ടുന്നതും സജീവ പരിഗണനയിലാണ്. കഴിഞ്ഞ ദിവസം ചേർന്ന യോഗത്തിൽ സംസ്ഥാന സർക്കാരും റെയിൽവേയും ഈ വിഷയം ചർച്ച ചെയ്തു. ശബരിപാത പൂനലൂരിൽ എത്തിച്ചു കൊല്ലം -ചെങ്കോട്ട പാതയിൽ കൂട്ടിമുട്ടിക്കുന്നതോടെ അങ്കമാലിയിൽ നിന്നു തിരുവനന്തപുരത്തിനുള്ള രണ്ടാം പാതയായി ഇത് മാറിയേക്കും.

2446 views
Nov 29 2016 (14:25)
emailconnect2hari   749 blog posts   1 correct pred (50% accurate)
Re# 2074868-1            Tags   Past Edits
Translate this.
Aug 28 2016 (10:19)  TVPM-Mangalore Express derails near Angamaly (english.manoramaonline.com)
back to top
Crime/AccidentsSR/Southern  -  

News Entry# 278372     
   Past Edits
Aug 28 2016 (10:19AM)
Station Tag: Angamaly for Kalady/AFK added by Rail Fanning~/718429
 
 
Twelve coaches of the Thiruvananthapuram-Mangalore Express (16347) derailed at Karikutti near Angmal...
No one was hurt, but rail traffic is likely to be affected as the derailed coaches have fallen onto the second track.
The railways do not suspect any foul play in the incident, as per initial reports.
Passengers bound to Mangalore have been accommodated on a train from Chennai for onward journey.
...
more...

Some have been taken to Aluva to return, according to railway officials.
It will take the railways at least till afternoon to remove the derailed bogies, that included AC coaches, from the tracks, railway officials informed.
All trains in the route have been halted at various stations.
Page#    Showing 1 to 13 of 13 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.